15.Break-In Procedure; 16.Cutting  Tool  Cautions - Nakanishi E800Z Operation Manual

Table of Contents

Advertisement

Break-In Procedure
15  
The E800Z is a high-precision, high-speed motor-spindle, the following procedure must be followed to 
ensure proper operation and longevity. 
During  transportation,  storage  or  installation  the  grease  inside  the  bearings  will  settle.  If  the  motor-
spindle  is  suddenly  run  at  high-speed  excessive  heat  will  cause  bearing  damage.  After  installation, 
repair, initial operation, or long periods of non operation please follow the break-in procedure detailed in  
Table 3 for E800Z
 Steps 
min
-1
(rpm) 
Running Time 
Items to Check
Cutting tool cautions
16  
(1) The proper surface speed for vitrified grindstones is 600-1800m/min. 
 
CAUTION
! 
 
Do not exceed a surface speed of 2,000m/min for grinding.
 
 
 
Surface Speed  ( m/min)= 
 
(2) Do not exceed 13㎜ overhang for mounted grindstones. In case overhang must exceed 13㎜ reduce 
the motor speed in accordance with Fig.26 and Table 4. 
 
Table 4.Overhang and Speed
 
Overhang (㎜) 
 
 
20 
 
25 
 
50
 
※ N=Max. operating speed at 13㎜ overhang.
 
(3) Do not use tools with bent or broken shanks, cracks or excessive runout. 
(4) Dress the grindstone prior to use. 
(5) For grinding the maximum depth of cut should not exceed 0.01㎜ radially or axially.  Reciprocate the 
tool several times after each in feed step. 
(6) Always  operate  tools  within  the  tool  manufacturer , s  recommended  speed  limits.  Use  of  a  tool 
outside  of  the  manufacturer , s  recommended  speed  limits  could  cause  damage  to  the  spindle  and 
injury to the operator. 
(7) Keep the tool shank and collet clean.  If contaminants are left in the collet, they can cause excessive 
runout and damage the tool and spindle. 
(8) Do not drop or hit spindle.
19
 1 
10,000 
5Min. 
No abnormal noises 
or vibration.  Check 
lubricator oil supply.
3.14×Diamete (㎜) × rotation speed (min
Max. Operating  Speed (min
N×0.5 
N×0.3 
N×0.1
Table3 
 2 
30,000 
2Min. 
Spindle Housing no 
hotter than 20 C.  If 
hotter than 20 C stop 
for at least 20 
minutes, check 
installation and 
restart Break-In 
procedure.
1000
−1
) 
 3 
50,000 
2Min. 
Spindle Housing no 
hotter than 20 C.  If 
hotter than 20 C stop 
for at least 20 
minutes, check 
installation and 
restart Break-In 
procedure.
Fig.26
 4 
80,000 
2Min. 
Spindle Housing less 
than 20C.
−1
) 

Advertisement

Table of Contents
loading

Table of Contents