3. Set second case within one foot (1') of the first
case. Keep the supports along the length of the
case and far end of case. Level case to the first
using the instructions in step one.
4. Apply liberal bead of case joint sealant (bu-
tyl) to first case. Sealant area is shown using a
dotted line in illustration. Apply heavy amount to
cover entire shaded area.
ATTENTION
INSTALLER
It is the contractor's responsibility to install
case(s) according to local construction and
health codes.
5. Apply liberal bead of case joint sealant (bu-
tyl) to first case. Sealant area is shown using a
striped line in illustration in page 16. Apply heavy
amount to cover entire shaded area.
6. Slide second case up to first case snugly.
Then level second case to the first case so glass
front, bumper and top are flush.
< 1'
10
Do not use bolts to pull cases together.