INSTALLATION

The installation and commissioning of the units should be carried out only by competent
and qualified personnel according to the current regulations and standards.
3.1

Recommended handling procedure

ModuSat 80, 150 & 200 - The unit should be moved into position still within its packaging
and on its pallet to prevent any damage whilst being positioned. Once correctly sited, the
unit should be lifted from pallet and into final position.
ModuSat 300 & 400 Handling (Instructions below are for the FS 300 & 400 units only)
The unit should be moved into position as follows:
Handling from the front or back
Slide pallet truck under unit
carefully between the feet (As
indicated in the images above)
and manoeuvre in to position.