Installation (Continued):
Installing Seismic Brackets (optional):
This unit includes four seismic brackets in the event such
brackets are a requirement for the installation of this unit.
The top-half of these brackets have already been
installed on the unit.
If the heater installation requires that the seismic
brackets be used, the bottom-half of these seismic
brackets may be secured to the floor and then fastened
to the bracket halves on the cabinet. The customer can
decide whether to install the bottom half of the brackets
to face inward or outward, as shown below.

Plumbing:

The plumbing installation of this unit should only be performed by qualified technicians.
Vérifiez que l'alimentation d'alimentation en eau
et de gaz de purge est fermé, et tous les
dispositifs de verrouillage / débranchement
nécessaires sont correctement installés.
M-43-25
Revision - Date 03-01-04-18
Bottom facing outward
Figure 23: Seismic Bracket Assembled, two
possible orientations
Figure 22: Seismic Brackets (top-half)
Attached to Cabinet
Bottom facing inward
Verify that the water supply and purge gas supply
is shut off, and any necessary lockout/tagout
devices are properly installed.