Huawei NetCol5000-A035 Quick Manual page 6

In-row air cooled smart cooling product
Hide thumbs Also See for NetCol5000-A035:
Table of Contents

Advertisement

4. Secure the top sealing plate of the
enclosure frame to the enclosure frame
using four M5 tapping screws.
(Optional) Installing an Top Frame
3.4
Bottom pipe routing
Top pipe routing
5. Install the hinges and connecting plates on the
corresponding positions on the enclosure frame.
6. Install the power cable for the display screen.
Connect the ground cable under the front door
to the enclosure.
After installing the enclosure frame, the power
cable for the display screen may be not long
enough to open the door completely. Cut off
the cable ties, which fastening the power
cable, to make sure the front door can rotate
smoothly.
Install two M5x10 tapping screws (step3) at the front of the top
frame to set up equipotential bonding between the cabinet and
the top frame.
6

Advertisement

Table of Contents
loading

Table of Contents