Section 3 - Handling, Storage, Installation And Reassembly; Figure 3 - Warning - York EX Series Installation, Operation & Maintenance Instructions Manual

Double effect direct fired absorption chiller-heater
Table of Contents

Advertisement

FORM 155.32-ICOM1.EN.GB
ISSUE DATE: 10/13/2017
SECTION 3 – HANDLING, STORAGE, INSTALLATION AND REASSEMBLY

FIGURE 3 - WARNING

Rigging and lifting should only be done by
a professional rigger in accordance with a
written rigging and lifting plan. The most
appropriate rigging and lifting method
will depend on job specific factors, such
as the rigging equipment available and
site needs. Therefore, a professional rig-
ger must determine the rigging and lifting
method to be used, and it is beyond the
scope of this manual to specify rigging and
lifting details.
JOHNSON CONTROLS
This chiller-heater is for air conditioning or a cooling
manufacturing process. Transport, store, and use this
chiller-heater under the following conditions:
Installation location:
Ambient temperature: 10 ~ 40°C
Humidity:
Altitude:
If the plant room will ever get below 10°C, you must
have the cold ambient option.
Indoor, non-explosion area
10 ~ 90% (RH%)
1000 m or lower
21
3
LD18119

Advertisement

Table of Contents
loading

Table of Contents