Cisco ASR 907 Installing page 61

Hide thumbs Also See for ASR 907:
Table of Contents

Advertisement

Installing the Cisco ASR 907 Router
Figure 39: Patch Panel Front View with Brackets and Guides
Figure 40: Patch Panel Rear View with Brackets and Guides
Step 5
Secure the guides to the brackets with the screws. The recommended maximum torque is 28 in.-lb (3.16 N-m).
Step 6
Position the patch panel with brackets and guide onto the rack and secure with screws provided. The
recommended maximum torque is 28 in.-lb (3.16 N-m), see the figure below.
Installing Patch Panel
Installing the Cisco ASR 907 Router
61

Advertisement

Table of Contents
loading

Table of Contents