Page 1
ED50 Low Energy Swing Door Operator (Fine cover) Installation Instructions DL4615-001 – 01-2020 | EN |...
Page 2
ED50 Installation Instructions – Fine cover Table of Contents Table of contents Table of contents ED50 operator installation General information 12.1 Installation preparation General information 12.2 Installation templates, single door Product description 12.3 Installation templates, double doors Product description 12.4...
ED50 Installation Instructions – Fine cover Table of Contents Parameters Appendix A - Driving parameters 18.1 Parameters Driving parameters – detail Single door first commissioning Appendix B - Troubleshooting 19.1 First commissioning Information and error codes 19.2 Set configuration parameters Red LED status codes 19.3...
Page 4
1.1.6 Symbols used in these instructions. This manual provides installation instructions for WARNING ED50 swing door operators used in single, double door and double egress installations. This symbol warns of hazards which could result in personal injury or threat to health.
Page 5
(2) boxes, each containing push arm or pull arm kit time. (Para. 4.8). WARNING To reduce risk of injury to persons, use this ED50 operator only with an automatic swing door for which the ED50 is designed for. Reference Chapter 6, Technical data.
Page 6
WARNING 3.2 Door signage requirements. Proper signs and labels shall be applied and maintained on Crushing hazards at door closing edges! the door controlled by the ED50 swing door operator. • Reference Chapter 10, ED50 Door Signage. Fig. 3.1 Door closing edges 3.3 Safety warnings.
Page 7
End cap, power switch Mounting plate 115 Vac terminal block Spindle cap Spindle cap ED50 pull arm system Fig. 4.2.1 ED50 RH pull arm system example ED50 operator Track/arm assembly Axle extension Standard cover End cap, program switch End cap, power...
Page 15
ED50 Installation Instructions – Fine cover Chapter 4 Push arm door stop - option Fig. 4.9.1 Door stop assembly Fig. 4.9.2 Mounting screw kit 1/2" thick base plate DC4633-002 1/4" thick base (4) 5.1 plate DC4633-001 Rubber bumper DC4633-003...
Page 16
ED50 Installation Instructions – Fine cover Chapters 4 and 5 4.10.2 Full width cover kit, double door DK3401-07X. Fig. 4.10.2 Full width cover kit DK3401-05X Cover, pair DD0758-010 Mounting plate connectors Mounting plate, pair dormakaba logo M6 x 10 mm SHS...
Page 17
ED50 Installation Instructions – Fine cover Chapter 5 Double door ED50 operator connection cables Fig. 5.2.1 Communication cable Fig. 5.2.2 115 VAC power cable Communication cable DX3485-010, 250 mm, 9 7./8" DX3485-020, 1030 mm, 40 1/2" DX3485-030, 2030 mm, 80"...
Page 18
ED50 Installation Instructions – Fine cover Chapter 6 6 Technical data ED50 Technical data 6.1.1 Required operating conditions 6.1.4 Outputs Maximum wire size Ambient temperature 5 to 122 °F [-15 to 50⁰ C] 16 AWG Connector plug 1/16” Suitable for dry...
Page 19
Low energy product 7.1.1 Automatic mode 7.2.1 ANSI/BHMA 156.19 Door closer mode parameter hd=0. ED50 operator is configured to meet requirements of a Designed for automatic access following pulse low energy application per ANSI/BHMA A156.19, generation by a knowing act device.
Page 20
ED50 Installation Instructions – Fine cover Chapter 8 8 User interface Overview Fig. 8.1.1 Operator keypad and display 8.1.1 Operator user interfaces. 2 digit display 1. 4 button keypad and 2 digit display. 4 button keypad • 4 button keypad; to select, input and adjust door parameter values.
Page 21
ED50 Installation Instructions – Fine cover Chapter 8 Program switches 8.3.1 Program switch control modes. Fig. 8.3.1 Program switches • Close, door closes automatically, or Exit Only switch, remains closed. 2 position Program switch, 3 position • Auto, door opens following pulse generation by a knowing act device or push/pull.
Page 22
ED50 Installation Instructions – Fine cover Chapter 9 9 System accessories System accessory electrical connections Fig. 9.1.1 Electrical connections, single door External program 3 x 12 AWG switch, mechanical 115 VAC power 3 x 4.0 mm External program switch, electronic...
Page 23
ED50 Installation Instructions – Fine cover Chapter 9 ED50 terminal board interfaces Fig. 9.3.1 Terminal board electrical connections Green LED (Para. 8.4) Night- Activation inputs Yellow LED (Para. 8.4) Interior Exterior bank Safety sensors Red LED (Para. 8.4) input...
Page 24
ED50 Installation Instructions – Fine cover Chapter 10 10 ED50 door signage 10.1 Low energy operator 10.1.1 Overview Fig. 10.1.1 AUTOMATIC CAUTION DOOR decal Signage and warnings are specified in ANSI /BHMA A156.19, American National Standard for power assist AUTOMATIC and low energy power operated doors.
Page 25
ED50 Installation Instructions – Fine cover Chapter 10 10.3 Door signage, low energy double doors Fig. 10.3.4 Knowing act, non-hinge side Fig. 10.3.1 Knowing act, non-hinge side AUTOMATIC AUTOMATIC CAUTION CAUTION AUTOMATIC AUTOMATIC CAUTION CAUTION DOOR DOOR DOOR DOOR...
Page 26
ED50 Installation Instructions – Fine cover Chapter 10 10.4 Safety label, low energy swing Fig. 10.4.2 Annual Fig. 10.4.1 Safety compliance information doors inspection label label 10.4.1 Low energy swinging door safety information ANNUAL COMPLIANCE SAFETY INFORMATION label INSPECTION...
Page 27
ED50 Installation Instructions – Fine cover Chapter 11 11 Recommended tools and torque chart 11.1 Recommended tools Fig. 11.1.1 Recommended tools T-handle hex key, 5 Hex keys, 2.5 mm, 3 mm, 6 mm Screwdriver, flat blade Door pressure gauge, 0 to 35 ft - lbf...
Page 28
Doors. width cover installation. 12.1.1 dormakaba USA, Inc. ED50 hardware. 12.1.6 ED50 115 Vac electrical installation. 1. Locate shipping boxes for ED50 operator and WARNING hardware. Work on electrical equipment and 115 Vac 12.1.2 Door frame and door.
Page 29
ED50 Installation Instructions – Fine cover Chapter 12 12.2 Installation templates, single door Fig. 12.2.1 Assembly on hinge side, pull version with slide channel and short pivot pin 5 7/8” [150] 4 3/16” [106] 4 3/4” 4 3/4” 4 3/4”...
Page 30
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.2 Assembly on hinge side, pull version with slide channel and long pivot pin 5 7/8” [150] 4 3/16” [106] 3 15/16” 4 3/4” 4 3/4” 4 3/4” 3 3/4”...
Page 31
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.3 Assembly on hinge side, pull version with slide channel CPD and short pivot pin 5 7/8” [150] 4 3/16” [106] 4 3/4” 4 3/4” 4 3/4” 3 3/4” 3 15/16”...
Page 32
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.4 Assembly on hinge side, pull version with slide channel CPD and short pivot pin 5 7/8” [150] 4 3/16” [106] 3 15/16” 4 3/4” 4 3/4” 4 3/4” 3 3/4”...
Page 33
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.5 Assembly on opposite hinge side, push version with slide channel and short pivot pin 5 7/8” [150] 4 3/16” [106] 3 3/4” 4 3/4” 4 3/4” 4 3/4” 3 15/16”...
Page 34
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.6 Assembly on opposite hinge side, push version with arm assembly 5 7/8” [150] 4 3/16” [106] 3 3/4” 4 3/4” 4 3/4” 4 3/4” 3 15/16” 1 3/4” [95]...
Page 35
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.7 Assembly on opposite hinge side, push version with arm assembly EN 7 9 7/8” [250] 8 1/8” 3 3/4” 4 3/4” 4 3/4” 4 3/4” 3 15/16” [206] [95]...
Page 36
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.8 Assembly on centrally supported door with slide channel CPD and short pivot pin 5 7/8” [150] 4 3/16” 4 3/4” 4 3/4” 4 3/4” 3 3/4” [106] 3 15/16”...
Page 37
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.2.9 Assembly on centrally supported door with slide channel CPD and short pivot pin 5 7/8” [150] 4 3/16” 4 3/4” 4 3/4” 4 3/4” 3 3/4” [106] 3 15/16”...
Page 38
ED50 Installation Instructions – Fine cover Chapter 12 12.3 Installation templates, double doors Fig. 12.3.1 Pull version, mounting on hinge side, Professional cover, standard axle extension 5/8” 5/8” 5 1/8” [130] [15] [15] 2 3/4” [70] 5 7/8” 5 7/8”...
Page 39
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.3.2 Pull version with CPD lever, mounting on hinge side, Professional cover, standard axle extension 5/8” 5/8” 5 1/8” [130] [15] [15] 2 3/4” [70] 2 3/8” [61] 5 7/8”...
Page 40
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.3.3 Push version with track, mounting on opposite hinge side, Professional cover, standard axle extension 5/8” 5/8” 5 1/8” [130] [15] [15] 2 3/4” [70] 5 7/8” 5 7/8” A+B+10...
Page 41
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.3.4 Push version with arm, mounting on opposite hinge side, Professional cover, standard axle extension 5/8” 5 1/8” [130] 5/8” [15] 2 3/4” [70] [15] 1 5/16” [33] EN 7 = EN 7 = 9 7/8”...
Page 42
1. Remove 115 Vac plug (5) from its receptacle (6). 12.4.2 Remove mounting plate from operator. 1. Loosen all eight captive ED50 M6 socket head cap screws (SHCS) using a 5 mm hex T-handle. TIPS AND RECOMMENDATIONS Insure all eight fasteners are free of the mounting plate.
Page 44
ED50 Installation Instructions – Fine cover Chapter 12 Fig. 12.5.5 115 Vac terminal block mounting 12.5.3 Install conduit box (option). 115 VAC terminal block TIPS AND RECOMMENDATIONS Ground terminal 115 Vac terminal block is secured M3.5 screw to mounting plate by M3 x 25 115 Vac plug to Phillips head screw.
Page 45
ED50 Installation Instructions – Fine cover Chapter 12 12.6 Mounting plate attachment to jamb or wall Fig. 12.6.1 Mounting plate installation NOTICE Mounting plate installation location based on selected installation template. • Reference Para. 12.2 (single door) and 12.3 (double door) installation templates.
Page 46
ED50 Installation Instructions – Fine cover Chapter 12 12.7 Connect customer 115 Vac to mounting plate terminal block Fig. 12.7.1 115 Vac wiring example 115 Vac terminal block 12.7.1 Connect customer 115 Vac wiring. Ground post WARNING Work on electrical equipment and...
Page 47
ED50 Installation Instructions – Fine cover Chapter 12 12.9 Remove protective film strips from operator Fig. 12.781 Operator heat conductive pads 12.9.1 Remove protective film strips. Heat conductive pad 1. Remove two protective film strips from operator heat conductive pads.
Page 48
ED50 Installation Instructions – Fine cover Chapter 13 13 Push arm installation 13.1 Push arm installation templates NOTICE Reference Para. 12.2 (single door) and Para. 12.3 (double door) installation templates. Fig. 13.1.1 Push arm assemblies Standard push arm, reveal depths 0 - 8"...
Page 49
Fig. 13.2.5 Push arm assemblies for installation Reference Para. 13.6, Set operator spring tension. 2. Insert axle extension into drive arm. 3. Move arm to ED50, inserting arm into operator spindle at a 90⁰ angle (Fig. 13.2.5). 4. Insert M8 SHCS through drive arm and axle extension.
Page 50
ED50 Installation Instructions – Fine cover Chapter 13 Fig. 13.2.7 Arm assemblies attached to door and ED50 13.2.5 Connect adjustment arm to drive arm. 1. Loosen the two adjustment M6 x 10 mm flanged button head screws (Fig. 13.2.9).
Page 51
ED50 Installation Instructions – Fine cover Chapter 13 13.6 Set ED50 operator spring tension Fig. 13.6.1 Spring tension adjustment Spring tension adjustment 13.6.1 Spring tension setting revolutions 13.6.2 Operator spring tension function. 1. Spring tension sets closing force on door.
Page 52
ED50 Installation Instructions – Fine cover Chapter 14 14 Arm with track mount installation 14.1 Arm with track installation NOTICE Reference Para. 12.2 (single door) and Para. 12.3 (double door) installation templates. 14.2 Splined arm and track assemblies Fig. 14.2.1 Splined arm with CPD lever and Fig.
Page 53
ED50 Installation Instructions – Fine cover Chapter 14 14.4 Slide shoe assembly 14.4.1 Install pivot pin into slide shoe. Fig. 14.4.1 Slide shoe and pivot pin 1. Insert pivot pin into slide shoe. Slide shoe Pivot pin 2. Install spring clip into pivot pin slot.
Page 54
ED50 Installation Instructions – Fine cover Chapter 14 14.6 Fasten track assembly to door 14.6.1 Mount track assembly on door. Fig. 14.6.1 Track assembly Track CAUTION Fixing piece Insure track hardware is Slide shoe assembled for hand of door.
Page 55
ED50 Installation Instructions – Fine cover Chapter 14 14.7 Arm assembly Fig. 14.7.1 Arm assembly 14.8 Arm assembly with CPD lever 14.8.1 Arm with CPD lever assembly. Fig. 14.8.1 Slotted Fig. 14.8.2 M6 x 10 spring SHCS M6 x 10 SHCS...
Page 56
ED50 Installation Instructions – Fine cover Chapter 14 14.9 Fasten arm to ED50 operator 14.9.1 Mount drive arm to operator. Fig. 14.9.1 Mount drive arm to operator at 12 degrees WARNING 12° Use caution when working in proximity of door and pull arm!.
Page 57
ED50 Installation Instructions – Fine cover Chapter 14 Fig. 14.9.6 Fastening drive arm to pivot pin 14.9.2 Attach drive arm to pivot pin. 1. Open door as required to access pivot pin M8 socket head. 2. Use 6 mm T handle hex key to rotate pivot pin M8 socket head into drive arm and tighten.
Page 58
ED50 Installation Instructions – Fine cover Chapter 15 15 Measure door width, reveal depth 15.1 Door width parameter Tb 15.2 Tb parameter values 15.2.1 ED50 door widths Parameter Description Reference Door width measurement Door width Chapter 18 Inches [mm]...
Page 59
ED50 Installation Instructions – Fine cover Chapter 15 15.3 Reveal depth parameter rd Fig. 15.3.1 Positive reveal Parameter Description Reference Positive reveal depth Reveal depth Chapter 18 15.3.1 Reveal depth parameter Mounting surface 1. Reveal depth is set in increments of 10 mm (approximately 3/8").
Page 60
ED50 Installation Instructions – Fine cover Chapter 16 16 Braking circuit plug 16.1 Braking circuit plug position Fig. 16.1.1 Braking circuit socket and plug, plug factory installed in pull installation location Braking circuit plug Braking circuit 3 pin socket User interface Fig.
Page 61
ED50 Installation Instructions – Fine cover Chapter 17 17 Power fail closing speed 17.1 Set power fail closing speed Fig. 17.1.1 Power fail closing speed potentiometer Power fail closing speed potentiometer Control board 17.1.1 Power fail closing speed Fig. 17.1.2 Power on switch potentiometer.
ED50 Installation Instructions – Fine cover Chapter 18 18 Parameters 18.1 Parameters 18.1.21 Firmware version and updates. 18.1.4 Changing parameter values. • Operator firmware version is displayed during first 1. Set program switches to the CLOSE position commissioning. Reference Chapter 19.
Page 63
ED50 Installation Instructions – Fine cover Chapter 18 18.1.5 Configuration parameters. TIPS AND RECOMMENDATIONS Parameter Description Driving parameter details can be found in Appendix A. Installation type Reveal depth Driving parameter Door width Description Input 4/4a and X3, 1G 24V locking...
Page 64
CPD lever in a pull installation. • Example: ED50 with arm and CPD lever in pull installation with reveal of 30 mm (1 1/8"). Parameter rd setting = 0 (Reveal of 30 mm - 30 mm).
ED50 Installation Instructions – Fine cover Chapter 19 19 Single door first commissioning 19.1 First commissioning Fig. 19.1.1 Program switch Conditions prior to commissioning. Program switch, 3 position 1. ED50 operator is installed. 2. Standard push arm or arm with track is installed.
ED50 Installation Instructions – Fine cover Chapter 19 19.2 Set configuration parameters 19.2.1 Set parameter AS, installation type. Fig. 19.2.1 4 button keypad, 2 digit display Step 1 Press PRG greater than 3 s to enter Four button Press...
ED50 Installation Instructions – Fine cover Chapter 19 19.4 Perform learning cycle CAUTION Step 1 Secure motion range of door. Learning cycle must be performed while Set program switch to CLOSE position, Step 2 motor is cold! Fig. 19.3.1.
ED50 Installation Instructions – Fine cover Chapter 20 20 Double door first commissioning 20.1 Separately commission active and inactive doors 20.1.1 Commission active door first. 1. Refer to Chapter 19 and commission active door. 20.1.2 Commission inactive door. 1. Refer to Chapter 19 and commission inactive door.
Page 70
ED50 Installation Instructions – Fine cover Chapter 20 20.2.2 Active door, set parameters dL and Ad. Door type 1. Set active door program switches to CLOSE. 2. Set parameters dL (door type) and Ad (caster angle ) Parameter for active door.
ED50 Installation Instructions – Fine cover Chapter 20 20.2.3 Inactive door, set parameter dL. 1. Set program switch to CLOSE. 2. Set parameter dL (door type) for inactive door. Step 1 Step 5 Press and hold PRG > 3 s to enter...
ED50 Installation Instructions – Fine cover Chapter 21 21 Set track bumper stop 20.1 Set track bumper stop position 20.1.1 Set bumper stop position. Fig. 20.1.1 Program switches OPEN position 1. Set program switch to OPEN. 2. Door moves to set opening angle.
ED50 Installation Instructions – Fine cover Chapter 22 22 Install push arm door stop 22.1 Install push arm door stop (optional assembly) Fig. 22.1.1 Door stop assembly TIPS AND RECOMMENDATIONS 1/2" thick base plate Contact local dormakaba USA, Inc.
ED50 Installation Instructions – Fine cover Chapters 23 and 24 23 Install door signage 23.1 Install door signage 23.1.1 Install door signage based on type of door operation. Install applicable door signage as outlined in Chapter 10, ED50 door signage.
ED100 / ED250 Installation Instructions Chapter 25 25 ANSI/BHMA standards 25.1 A156.19 Low energy power operated doors The following table references portions of content from ANSI/BHMA A156.19. Refer to the standard, available through ANSI or BHMA for additional information. Standard material reprinted with BHMA permission.
26 Upgrade cards 26.1 Upgrade cards 26.2 Container module 26.1.1 Upgrade card installation. 26.2.1 Container module dormakaba upgrade cards can be used to expand the range of • The first upgrade card installed becomes functions of ED900 operators. the container module.
ED50 Installation Instructions – Fine cover Chapter 26 26.3 Installing upgrade cards 26.3.3 Installing additional upgrade cards 26.3.1 Set program switch to CLOSE. Upgrade card slot 1. Remove container Professional module from upgrade Set program switch to Close. upgrade card card slot.
Fig. 27.2.1 ED50 low energy installation clear of all obstacles. 27.2.3 Cleaning WARNING Cleaning of ED50 cover surfaces should be done with program switches in Close position! ED50 cover can be cleaned with a damp cloth and commercial cleaning agents. AUTOMATIC CAUTION DOOR DD0586-010...
ED50 Installation Instructions – Fine cover Chapter 27 27.5 Pull arm maintenance Fig. 27.5.1 Arm and track assembly Fig. 27.5.5 Program switch 27.5.1 Track mounting screws. 1. Set program switch to CLOSE. 2. Remove track end caps 3. Check tightness of track mounting screws.
ED50 Installation Instructions – Fine cover Chapter 27 27.6 Arm fasteners – torque requirements 27.6.1 Check drive arm M8 SHCS torque. Fig. 27.6.1 Arm M8 SHCS cap 1. Set program switch to CLOSE. 2. Remove cap over M8 SHCS.
ED50 Installation Instructions – Fine cover Chapter 27 27.6 Push arm maintenance Fig. 27.6.1 Push arm assembly 27.6.1 Push arm maintenance. WARNING Set program switch to CLOSE before performing maintenance! 1. Adjustment arm. • Check for wear or damage.
ED50 Installation Instructions – Fine cover Chapter 27 27.7 ED900 brake maintenance 27.7.1 Adjustment of air gap: Fig. 27.7.1 ED900 operator brake to brake disc (Fig. 25.7.2). TIPS AND RECOMMENDATIONS Reference drawing: 254197-01-50 WARNING Brake assembly Set program switch to CLOSE Fig.
Page 86
ED50 Installation Instructions – Fine cover Chapter 27 27.7.2 Torque setting of M3 x 5 SHCS. Fig. 27.7.5 M3 x 5 SHCS • 5.3 in-lb + 0.9 in-lb [0.6 Nm +0.1 Nm] Brake assembly Brake disc assembly M3 x 5 SHCS Fig.
ED50 Installation Instructions – Fine cover Appendix A Appendix A - Driving parameters Driving parameters – detail A.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Opening speed, automatic mode 1. Opening speed refers to automatic mode, speed can be adjusted using this parameter.
Page 88
ED50 Installation Instructions – Fine cover Appendix A A.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Safety sensor test Safety sensor parameter ST must be set to sensors used and if they are active-high or active-low. See E 04 safety sensor test error, Appendix B.
Page 89
.45- 3.4 1.35 See Chapter 25. 4. ED50 low energy operator: static force range is reduced. Static force in closing direction 1. Static force in closing direction (basic parameter for wind load control). Static force on door closing edge can be changed using this parameter.
Page 90
ED50 Installation Instructions – Fine cover Appendix A A1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Push & Go 1. Parameter is activated. 2. Automatic opening of door is started when door is manually moved 4° out of the 0 - 1 closed position.
Page 91
1. Status relay activated when door is opened further than opening angle parameter OA, set during learning cycle. 2. Parameter OA value can only be changed using dormakaba handheld or by performing another learning cycle. Locking device output configuration;...
Page 92
ED50 Installation Instructions – Fine cover Appendix A A.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Factory setting level Parameter SL is used to determine what data will be reset during factory setting process. Standard factory settings •...
Page 93
ED50 Installation Instructions – Fine cover Appendix A 26.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Power assist function 1. Force setting for Power assist function. 2. Power assist function only available with hd parameter = 1, manual mode.
Page 94
COM 1 configuration interface Interface programmed for communication with dormakaba handheld. 0 - 1 Interface programmed for use with dormakaba TMS Soft control software. Backcheck when door opened manually 1. Angle after which door is braked when manually opened. 2. Back check level is automatically optimized during manual door opening cycles. This...
Page 95
ED50 Installation Instructions – Fine cover Appendix A 26.1.1 Driving parameters detail. Value Factory Parameter Units Description range setting Castor angle for double doors Primary door with astragal, angle active door must open before secondary door opens. 0 - 30 °...
ED50 Installation Instructions – Fine cover Appendix B Appendix B - Troubleshooting Information and error codes Fig. B.1.1 User interface B.1.1 Overview 4 button keypad Operator monitors internal circuits and external safety 2 digit display circuits managed by the operator.
ED50 Installation Instructions – Fine cover Appendix B B.1.7 Error message memory. 1. There are ten error message memory locations; E 0 through E 9. 2. The latest error message is always stored in error memory location E 0: •...
3. If ln 08 still present, check activators or system wiring. Upgrade card error 1. Installed upgrade card cannot be removed from ED50. • Installed upgrade card has 2. If more than one upgrade card is installed, the first card installed becomes been removed.
ED50 Installation Instructions – Fine cover Appendix B B.3.1 Troubleshooting chart, information messages. Display Description Troubleshooting information messages Communication error, double 1. Check communication cable connection at the two operators. door system • No communication • Cable connects to the horizontal RJ 45 connector next to the user ln 61 between the two operators.
Page 100
ED50 Installation Instructions – Fine cover Appendix B B.4.1 Troubleshooting chart, "E" codes. Display Red LED • Description Troubleshooting error codes Overcurrent detection 1. Motor is consuming too much power, check for any external • Motor is consuming more Flashing causes.
ED50 Installation Instructions – Fine cover Appendix C Appendix C - dormakaba handheld dormakaba handheld terminal C.1.2 Handheld key functions. 1. OFF ON, switches Handheld on or off. Fig. C.1.1 dormakaba handheld 2. Function keys F1 - F3, trigger functions shown in bottom line of display (e.g., "RPT"...
ED50 Installation Instructions – Fine cover Appendix C NOTICE Parameters and detail may change depending on firmware version. dormakaba handheld; configuration parameters "#" refers to reference numbers in Parameter list, Chapter 18. C.2.1 Configuration parameters Parameter and Parameter and...
ED50 Installation Instructions – Fine cover Appendix C C.2.1 Configuration parameters Parameter and Parameter and Description / Selections Description / Selections default default Manual mode on. NO contact; night- Manual bank function mode Normal* Manual mode disabled. triggered while contact closed.
ED50 Installation Instructions – Fine cover Appendix C dormakaba handheld; special functions (Upgrade cards) ED50 C.4.1 Special functions (upgrade cards) Parameter and Parameter and Description / Selection Description / Selection default default • locked: not available locked Upgrade •...
ED50 Installation Instructions – Fine cover Appendix C dormakaba handheld; diagnostics C.5.1 Diagnostics Parameter name Description Setting Parameter name Description Setting FW vers BM Displays firmware (FW) x.x y y (e.g.,0190 Wartungs x x y y (month, version of basic module v 1.9.0)
Page 106
ED50 Installation Instructions – Fine cover Appendix C C.5.1 Diagnostics Parameter name Description Setting Parameter name Description Setting Clamp X3, 1G and 3, 0, low active Klemme 1G 24 V out Setting code (function on) 1, function off Opening width Displays opening angle ( ..
ED50 Installation Instructions – Fine cover Appendix C New dormakaba handheld; language change to English C.6.1 New dormakaba handheld; language 5. Press to select Sprachen (Fig. 26.6.6). ENTER Fig. C.6.1 change. Fig. C.6.7 Sprachauswahl (Language dormakaba handheld If German language is displayed on screen...
ED50 Installation Instructions – Fine cover Appendix C dormakaba handheld; firmware update C.7.1 Firmware update procedure CAUTION For all firmware changes, set program switch to CLOSE and allow door to close completely before any updates are made! Fig. C.7.1...
Page 109
ED50 Installation Instructions – Fine cover Appendix C Fig. C.7.5 Select Firmware upload Fig. C.7.4 Select UpDoLd ENTER button F2 button Up/down arrows Connected with: DOWN/UPLOAD ED50_US Download data FW-Version: 01.40 Upload file Revision: Firmware upload Again UpDoLd Door Door 4.
ED50 Installation Instructions – Fine cover Appendix D Appendix D - Full width cover options Full width cover installation instructions – single door Fig. D.1.1 Mounting plate D.1.1 Install ED50 mounting plate. Mounting plate installation: • Reference Chapter 12, Para. 12.6 Mounting plate attachment to jamb or wall.
Page 111
NOTICE DC3482-010 Program switch wiring. Once ED50 operator is installed, program switch wires will be connected to terminal board (Fig. D.1.10). Fig. D.1.9 ED50 installation with mounting plate extension Professional cover bracket DC3481-010 Program switch kit DC3482-010 Program switch Fig. D.1.10 ED50 program switch wiring...
Page 112
ED50 Installation Instructions – Fine cover Appendix D Full width cover installation instructions – double door D.2.1 Full width cover kit, double door DK3401-07X Fig. D.2.1 Full width cover kit DK3401-05X Cover, pair End cap set DC3466-01X Mounting plate...
Page 113
ED50 Installation Instructions – Fine cover Appendix D Fig. D.2.4 Mounting plate connectors and fasteners 2. Secure the operator mounting plates to the pair mounting plate (6) using: • (2) mounting plate connectors (4) • (2) M6 x 10 mm SHS with washer (8) •...
Need help?
Do you have a question about the ED50 and is the answer not in the manual?
Questions and answers