Download Print this page

MAKER MADE MASLOW CNC Setting Up page 19

Advertisement

TOP VIEW
TOP VIEW
TOP VIEW
LAST UPDATE 06.11.19
SIDE VIEW
SIDE VIEW
SIDE VIEW
NEXT STEP: INSTALLING THE Z-AXIS
STEP 8 ATTACH ROUTER, TO SLED
(3) 10-32 machine screws
• Insert screws through pre-drilled holes
from bottom of sled into router
• Tighten with Phillips-head screwdriver
STEP 9 ATTACH BRICKS TO SLED
Bag #3 Nuts, bolts
(2) brick holders
• Insert bolts through pre-drilled holes from
bottom of sled through to the top
• Place bricks between bolts
• Place wooden brick retainers over bolts
• Secure with nuts
STEP 10 ATTACH RING TO SLED
BAG #8 (18) small screws
• Place ring on sled centered around router
• Each L-bracket has six small holes, insert a
small screw through each hole
• Fasten with Phillips-head screwdriver
TEMPORARY SLED ASSEMBLY PG. 4

Advertisement

loading

Related Products for MAKER MADE MASLOW CNC