Download Print this page

MAKER MADE MASLOW CNC Setting Up page 31

Advertisement

LAST UPDATE 06.07.19
STEP 17: INSTALL BOLT FOR SLED
BAG #2 pulleys, BAG #4 wood screws
• Mark center front of top beam,
about .5" from top edge
• With .5" drill bit, drill hole in
marked spot
• Insert .5" carriage bolt into hole
• Secure with nut
STEP 18: INSTALL PULLEYS FOR CABLES
BAG #2 pulleys, BAG #4 wood screws
• Use center beam mark from Step 17
• Mark 1" to the left, 1" to the right
• Insert a screw through center of
each pulley
• Screw into marked spots
STEP 19: INSTALL CHAIN HARDWARE
BAG #4 wood screws
• Mark 8" from end of top beam
• Insert wood screw in marked spot
on underside of top beam
• Leave it protruding about .25"
STEP 20: PREPARE STRETCHY CORDS
BAG #2 stretchy cord, zip ties
• Fold over end of stretchy cord 3",
fasten with zip ties
• Trim ends of zip ties, repeat on all
cord ends
CALIBRATION PG. 6

Advertisement

loading

Related Products for MAKER MADE MASLOW CNC