Overhead Mounting
Overhead mounting attaches the unit to an
overhead surface with the use of "S" hooks. "S"
hook mounted units are available in 120V only and
are required to have a power cord and plug
connection.
NOTE: Units ordered with the "S" hook option come
with two "S" hooks and two 6" (152 mm)
pieces of connecting chain. Additional chain
(P/N 05.03.020.00) can be ordered from
Hatco for the overhead mounting system or
another option can be determined by a
qualified installer.
WARNING
For installation with chains, make sure the
chains have sufficient strength and are securely
fastened to both the unit and the mounting
location. Poorly installed chains may cause the
unit to loosen and fall. Do not place anything on
top of units installed with chains.
To ensure safe and proper operation, refer to the
Clearance Requirements listed in the Installation
section of this manual.
NOTE: The strength of the chain supplied by Hatco
is sufficient to hold the weight of the unit
securely only when mounted properly.
1. Prepare the overhead mounting system for the
"S" hooks. Make sure the system is secure and
is set up so the unit will be suspended at a level,
safe, and proper distance from walls, counter,
and food.
2. Loosen, but do not remove the screws securing
the hanger tabs on each end of the unit. Rotate
the tabs up, then tighten the screws securely.
3. Securely attach one of the 6" (152 mm)
connecting chains between each pair of hanger
tabs.
4. Attach an "S" hook to the center of each
connecting chain.
5. Carefully lift the unit and attach the "S" hooks on
each end of the unit to the overhead mounting
system. Make sure the unit is level.
Form No. GRM-0508
All manuals and user guides at all-guides.com
Overhead Mounting
System
Figure 25. "S" Hook Mounting
Sneeze Guard Installation (optional)
1. Remove the protective paper from the acrylic
surfaces.
2. Assemble each weld screw through the top of
the sneeze guard and through the support bar.
Loosely thread an acorn nut onto each of the
weld screws below the support bar.
3. Lift the sneeze guard assembly and carefully
slide each of the weld screws that are loosely
attached to the sneeze guard into the channel
on the unit (see Figure 27).
4. Align each end of the sneeze guard with the
ends of the unit and then tighten the acorn nuts
to secure the sneeze guard in position. Do not
over-tighten the acorn nuts.
Weld Screw
Acorn Nut
Support Bar
Figure 26. Installing Sneeze Guards
17
INSTALLATION
"S" Hook
Connecting Chain
Hanger Tab
Screw
Foodw armer
GLO -RAY
ON
PARTS &
SERVICE
800-558
-0607
ASSISTANCE
COM
WWW HATCOCORP
N - HOT
CAU TIO
ON
O
UKEE, WI
U.S.A.
OFF
CORP. MILWA
HATCO
WI U.S.A
.
O
AUK EE,
OFF
COR P. MILW
HATC O
Channel
Sneeze Guard

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Glo-ray grh seriesGlo-ray gra seriesGlo-ray grah seriesGlo-ray gral seriesGlo-ray grahl seriesGlo-ray grn series ... Show all

Table of Contents