MARUTI SUZUKI Ertiga Tour M Owner's Manual page 202

Table of Contents

Advertisement

INSPECTION AND MAINTENANCE
High beam
EXAMPLE
(2)
(1)
Open the engine food while the engine is
stopped.
Turn the cover (1) counterclockwise and
remove it.
Turn the bulb (2) holder counterclockwise
and remove it. Disconnect the coupler with
pushing the lock release.
6-27
Front turn signal light
Front position light
EXAMPLE
(1)
73R0134
(1) Front turn signal light
(2) Front position light
EXAMPLE
1) Open the engine hood while the engine
is stopped. To remove the bulb holder
of the front turn signal light or the front
position light from the light housing,
turn the holder counterclockwise and
(2)
pull it out.
EXAMPLE
(2)
(3)
73R0124
(4)
(3) Removal
(4) Installation
2) To remove the bulb of the front turn sig-
nal light (1) from the bulb holder, push
in the bulb and turn it counterclockwise.
To install a new bulb, push it in and turn
it clockwise.
To remove and install the bulb of the
front position light (2), simply pull out or
push in the bulb.
68PH0073
(1)
68PM00721
72RH0-74E

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Ertiga Tour M and is the answer not in the manual?

Table of Contents

Save PDF