Keysight M9703A Startup Manual page 15

Axie high-speed digitizer 8 channels, 12-bit, up to 3.2 gs/s dc up to 2 ghz bandwidth
Table of Contents

Advertisement

c. Slide the module completely into the chassis. When the module's con-
d. Slide the plastic ends of the extraction handles outwards and tighten the
5. Install filler panels in any unused slots. Missing filler panels may disrupt necessary
air circulation in the chassis.
6. If you are using a remote controller, with an interface such as the M9045B or
M9048A, connect the cable from the chassis to the PC host, as per the instruc-
tions that came with the interface.
7. Power up the chassis. It is often necessary to wait until the chassis and its mod-
ules have completed their start-up sequence before proceeding to power-up the
host controller.
8. Reboot or power-up the PC host. Check the module front panel indicators - after
the boot process the STATUS LED should be green, and no other LEDs lit.
Keysight M9703A Startup Guide
nectors contact the chassis backplane you will feel some resistance, and
the extraction handles will begin to move inwards. Now you may press the
handles inwards and towards the front panel until the module is completely
inserted.
captive retaining screws at both ends of the module.
Step 4: Install the Module
15

Advertisement

Table of Contents
loading

Table of Contents