Download Print this page

Samsung XPR Series Installation Manual page 36

Outdoor led, standard cabinet

Advertisement

2. Installation : Y8 Assembly
Attaching the Y8 board
screw
(sliding Y8 to Bracket, then turn lock)
Bracket Support
Y8 assembly
Fig.9 Y8 Board attachment point
assembly
9) Open the door on the rear of the cabinet and attach the Y8 board
(Fig.9)
36

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh080xprzas/pz