Download Print this page

Samsung XPR Series Installation Manual page 30

Outdoor led, standard cabinet

Advertisement

3. Installation : Mounting Cabinets (Rear installation)
Hang one more cabinet/section while adjusting X seam
based on the cabinet/section below.
Y seam
M8 L18 BOLT
Upward extension
cabinet/section
Tighten the two cabinets/sections directly from inside the cabinet with bolts.
(doors open) At the same time, adjust the Z-seam based on the
LED modules on the front.
Upward extension
cabinet/section
M8 L18 BOLT
cabinet below
Tighten the bolts between the bottom of the cabinet and the brackets
on the cabinet below.
M8 BOLT + NUT
Tighten the top every brackets to the L-shaped steel assembled on the H beam.
M8 BOLT + NUT
30

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh080xprzas/pz