Download Print this page
Samsung XPR Series Installation Manual

Samsung XPR Series Installation Manual

Outdoor led, standard cabinet

Advertisement

Outdoor LED Installation Manual
- XPR Series -
Standard Cabinet
LH080XPRZAS/PZ
Rev.0.9

Advertisement

loading

Summary of Contents for Samsung XPR Series

  • Page 1 Outdoor LED Installation Manual - XPR Series - Standard Cabinet LH080XPRZAS/PZ Rev.0.9...
  • Page 2: Table Of Contents

    Contents Installation Precautions 1. Product Information . Specification, Standard Cabinet, Package, Screen Configuration, Fan installation 2. Installation . Overview, Unboxing, Accessary Assembly, Fan Assembly, Handling Cabinet, Mounting Cabinet, Y8, Signal B’d Assembly, Cable Connections, Power Connections, Waterproof/ Bezel Accessary Assembly 3.
  • Page 3: Installation Precautions

    Installation Precautions – Important Guidelines to Follow • Precautions prior to Installation - Ensure that all personnel at the site of installation wear personal protection equipment, such as safety helmets, safety glasses, safety gloves and other appropriate safety equipment. - Ensure that at least two persons work together to move or transport the product so as to ensure safety. - Ensure that the power cord is not close to any heat sources.
  • Page 4 Installation Precautions – Important Guidelines to Follow ◇ Installation precautions for prevention of damage to LED Precautions Images [Be careful to prevent external impact or dropping] ① After removing the Cover-Corner from the product prior to installation, exercise caution to ensure that the LED surface is not exposed to physical impact and the product is not dropped onto the floor.
  • Page 5: Product Information

    1. Product Information: Specification ◇ XPR-S Series . CREE LED SPECIFICATIONS XPR-S P16TH Pitch CREE C4SMM Diode CREE CLY6C 8000 Max Brightness Nits Black Uniformity L10 +/- 0.15 (TBD) Video Processing 24 Bit Color Capacity 16 Bit 4,500 – 9,000K Color Temp 7,680Hz 7,680Hz...
  • Page 6 1. Product Information: Specification ◇ XPR-E Series . NS/XD LED SPECIFICATIONS XPR-E Pitch P16TH P20TH Diode NS FM2727 XDL-305J 7000 7500 Max Brightness Nits Black Uniformity L10 +/- 0.15 (TBD) Video Processing 24 Bit Color Capacity 16 Bit 4,500 – 9,000K Color Temp 7,680Hz 7,680Hz...
  • Page 7 1. Product Information: Standard Cabinet ◇ Standard Cabinet - Outside Front Rear...
  • Page 8 1. Product Information: Standard Cabinet ◇ Standard Cabinet - Product Size Item Spec Cabinet Size (W x H) 1000 mm x 1000 mm Module Size (A x B) 250 mm x 250 mm Set depth (D) 264.3 mm 38 kg Weight [kg]...
  • Page 9 1. Product Information: Standard Cabinet ◇ Standard Cabinet (+ Y8) - Product Inside ① PDS ② SMPS ⑥ ⑥ ③ AC Filter ⑦ ① ④ Power In SMPS SMPS ⑤ Power Out ② ② ③ ⑥ External Fan position SMPS SMPS ②...
  • Page 10 1. Product Information: Package ◇ Outdoor Cabinet Box - Read the label to make sure it is the right cabinet. 1265 Read the information in the attached label to check Model Code and Project...
  • Page 11 1. Product Information: Screen configuration ◇ Screen configuration (for P8) The screen is divided by size of the FHD and the size covered by the Y8(T’con) board: - FHD Zone (15 x 8 Cabinet) configuration which is the maximum configuration that can display content with a resolution of FHD or lower - Y8 Block (3 x 4 Cabinet) configuration which is the maximum configuration that can be covered by the Y8 board FHD ZONE...
  • Page 12 1. Product Information: Screen configuration ◇ Note: Zone configuration by screen ※ This zone configuration differs by pitch. Note that the zone configuration diagram below is applicable to P8. : Signal B’d : Forward Y8 B’d P8 ZONE1 P8 ZONE2 : Backward Y8 B’d P8 ZONE3 P8 ZONE4...
  • Page 13 1. Product Information: Screen Configuration ◇ Note: Zone configuration by screen The number of cabinets forming the FHD Zone varies depending on the Pitch, and the quantity and location of the Y8,Signal B'd are also different. [ XPR060-S/XPR060-E ] [ XPR080-S/XPR080-E ] [ XPR100-S/XPR100-E ] .
  • Page 14 1. Product Information: Screen Configuration ◇ Note: Zone configuration by screen [ XPR160-S/XPR160-E ] [ XPR200-E ] . Cabinet Configuration : 30 x 16 . Cabinet Configuration : 40 x 20 . Resolution : 1800 x 960 . Resolution : 1920 x 960 .
  • Page 15 1. Product Information: Fan installation location ◇ Fan installation location - Fan type : 2 External fan (Intake/Exhaust), 1 Internal fan - Repeat configuration for 5 Cabinet rows as shown below Air outlet Exhaust fan Intake fan/ Internal fan Air inlet [External Fan] Air outlet Exhaust fan...
  • Page 16 2. Installation : Overview ◇ Installation Overview - The installation follows the below order. - Prior to the assembly, clearly identify the pre-work. Cable Connection Unboxing Cabinets & Accessories Power Connection Fan Assembly Pre-Working Before Cabinet Hang Handling Cabinets Accessories Assembly On-site HW Installation Mounting Cabinets Control Room Setting...
  • Page 17: Installation

    3. Installation ◇ Accessories that need to be installed separately before and after the Cabinet assembly are as follows. ◇ Ex) Total Screen 3x4 Cabinet COVER ACCESSATRY, BEZEL EXHAUST FAN EXHAUST FAN EXHAUST FAN SIGNAL B’d 1) Pre-Cabinet Installation Accessories .
  • Page 18 2. Installation : Unboxing Cabinets & Accessories ◇ Pre-Installation Work - All Cabinet Do the following for all cabinets:. Ex) FHD Zone Screen : 1 cabinet : Work...
  • Page 19 2. Installation : Unboxing Cabinets & Accessories ◇ Unboxing ① Don’t hold this plastic ① part when move cabinet ② ② Squeeze the winged handles together Use Handle when ① and pull them out. move cabinet Open the box and remove the cushions. * When unboxing the package or moving the product, do not hold the handles in the middle of the rear door or the plastic covers on both Then, with the handles on the left and right sides of the cabinet,...
  • Page 20 2. Installation : Accessory Assembly ◇ Unboxing ① ① ① ① ① ① ② ③ ③ ② Ring Ring Bolt ③ ② Screw point Remove the Cover Corner (x4) on the four corners of the cabinet Attach the Eye Nut (x2) to the brackets at both ends on top of the cabinet.
  • Page 21 2. Installation ◇ Pre work on ground – lowest cabinets (P38) Do the following for lowest cabinets. Ex) FHD Zone Screen : 1 cabinet : to work on Bolt (M8,L18) ① ① ① Attach the Bracket-frame bottom L/R to the bottom of the cabinet...
  • Page 22 2. Installation ◇ Pre work on ground – Install the fan on every 5 lines (intake, Exhaust) (P23 ~ P24) ※ Install every fifth line, but if the screen is not a multiple of 5, install it at the top of screen ( Ex) FHD Zone Screen : 1 cabinet : to work on...
  • Page 23 2. Installation : Fan Assembly ◇ Intake / External FAN ② ② ② ① ① ② 4.After settling the External Fan on the filter, use a 2mm wrench to rotate the Wing nut on the left and right sides to secure the Fan. ③...
  • Page 24 2. Installation : Fan Assembly ◇ Internal FAN ① ① Hook the top of fan ① on the Bracket-support. ③ ① ② It depends on whether it is front or rear installation. Please refer to the image below. ③ ② * Rear service site : * Front service site : Screw M4 L6 1point...
  • Page 25 2. Installation ◇ Installation Guide ① Each Cabinets Gap(seam) spec / (Measurements based on each LED modules) Pitch A (X) B (Y) C (Z) 0.2~0.7 0.2~0.7 0.2~0.7 0.4~0.8 0.2~0.8 0.2~0.8 0.3~1.0 0.3~1.0 P6, P8, P10 0.3~1.0 0.3~1.0 ① When fixing after hanging the cabinet or making section, P16, P20 the workers at the front and back of the cabinet should ②...
  • Page 26 2. Installation : Handling Cabinets ◇ Guide to moving the product using a crane Make sure you use two wires (connected using Eye Nut) for each cabinet. • Use side hole for 2 wire (redundant wire) • Maximum number of cabinets that can be moved when installing a section: 4x2 cabinets(*spreader bar) •...
  • Page 27 2. Installation : Handling Cabinets ◇ How to make section (ex 4x2) ② ① ② M8 L18 BOLT M8 L18 BOLT Tighten the brackets against the top and bottom of the two cabinets ① with bolts. ① ③ ③ ② ②...
  • Page 28 2. Installation : Handling Cabinets ⑤ Cabinet to be extended M8 L18 BOLT ⑤ ④ ④ ⑤ Lowest of section Tighten the bolts between the bottom of the cabinet and the brackets on the cabinet below. Y seam M8 L18 BOLT ④...
  • Page 29 3. Installation : Mounting Cabinets (Rear installation) ① X seam Z seam M8 L18 BOLT ② ① M8 BOLT + NUT ① Lateral Lateral cabinet / section cabinet / section 1st cabinet /section Tighten the two cabinets/sections directly from inside the cabinet with bolts. M8 BOLT + NUT (doors open) At the same time, adjust the Z-seam based on the LED modules on the front.
  • Page 30 3. Installation : Mounting Cabinets (Rear installation) Y seam M8 L18 BOLT ⑤ Upward extension cabinet/section Tighten the two cabinets/sections directly from inside the cabinet with bolts. (doors open) At the same time, adjust the Z-seam based on the ⑥ LED modules on the front.
  • Page 31 3. Installation : Mounting Cabinets (Rear installation) ⑨ ⑨ ⑩ ⑦ M8 L18 BOLT M8 L18 BOLT Cabinet/Section extending sideways and upwards ⑦ Tighten the brackets against the top and bottom of the two ⑩ ⑧ ⑪ cabinets/sections with bolts. ⑧...
  • Page 32 2. Installation : Mounting Cabinets (Front installation) ① X seam Z seam M8 L18 BOLT ② ① M8 BOLT + NUT ① 1st cabinet/section 1st cabinet/section Tighten the two cabinets/sections directly from inside the cabinet with bolts. M8 BOLT + NUT (doors open) At the same time, adjust the Z-seam based on the LED modules.
  • Page 33 2. Installation : Mounting Cabinets (Front installation) Y seam M8 L18 BOLT ③ Upward extension cabinet/section Tighten the two cabinets/section directly from inside the cabinet with bolts. (doors open) At the same time, adjust the Z-seam based on the LED modules. And Reassemble the LED modules ③...
  • Page 34 2. Installation : Mounting Cabinets (Front installation) X seam Y seam M8 L18 BOLT ④ M8 L18 BOLT ③ Tighten the three cabinets/sections directly from inside the cabinet with bolts. ③ (doors open) At the same time, adjust the Z-seam based on the LED modules. And Reassemble the LED modules Cabinet/Section extending sideways and upwards...
  • Page 35 2. Installation B’d, Cable install flow - Install B ’ d and cable in the following order. Y8 Assembly . Y8 Address Setting EXHAUST FAN EXHAUST FAN EXHAUST FAN Signal B’d Signal B’d Assembly Cable Connection . ① Y8 to Module .
  • Page 36 2. Installation : Y8 Assembly Attaching the Y8 board screw (sliding Y8 to Bracket, then turn lock) Bracket Support Y8 assembly Fig.9 Y8 Board attachment point assembly 9) Open the door on the rear of the cabinet and attach the Y8 board (Fig.9)
  • Page 37 2. Installation : Y8 Assembly Y8 Address Setting - After installing the Y8 board, give the address so that the system can check the Y8 location. Refer to the figure below to specify the location by setting the corresponding binary switch. …….
  • Page 38 2. Installation : Y8 Assembly Y8 Address Setting Y8 Interface stage Address setting operation Address Switch operation Decimal Binary number - The power number on the drawing is [decimal digits] 00000000 . For address Switch manipulation [Binary] transformation 00000001 00000010 00000011 ※...
  • Page 39 2. Installation : Signal B’d Assembly Attaching the Signal Box screw Fig.10 Signal Box attachment point Attach the Bracket Support Attach the Signal Box (sliding Board to Bracket, then turn lock) Open the door on the rear of the cabinet and attach the Signal Box (Fig.10).
  • Page 40 2. Installation : Signal B’d Assembly Signal Board Assembly Optical repeater point Cable Gland Snap lock Signal Box attachment point Attach the optical repeater Fig.11 Connect the power cable Remove the cap and attach the cable gland to the power cable inlet port.
  • Page 41 2. Installation : Cable Connections Data cable Connection Cover disassemble Cable insert Cover assembly Fig.13 Data cable connection Fig.12 Power / Data cabling point Disassemble the cover at the back of the cabinet and reassemble the cover after connecting the data cable. (Fig.13) * Data cable specifications: It is necessary to add Teflon tape when using a cable with a circular, Φ7.0 ~ 8.0mm, and Φ7.0mm or less.
  • Page 42 2. Installation : Cable Connections ① Y8 to Module Y8 port After installing Y8, the data cable connects the following ports. • P6: Connect 12 ports of the total 16 ports 【 P6 】 4 ports are not used Y8 B’d 2 x 3 cabinet...
  • Page 43 2. Installation : Cable Connections ① Y8 to Module Y8 port After installing Y8, the data cable connects the following ports. • P8, 10, 16, 20: Connect 16 ports of the total 16 ports 【 P8, 10, 16, 20 】 Y8 B’d 3 x 4 cabinet...
  • Page 44 2. Installation : Cable Connections ① Y8 to Module Screen, Block Configuration • Screen (P8) , Block Configuration • Screen (P10) , Block Configuration - Block : 3 x 4 Cabinet, Y8 Board is able to control upto - Block : 4 x 4 Cabinet is able to control upto (3x4) Cabinet (4x4) Cabinet Backward...
  • Page 45 2. Installation : Cable Connections ① Y8 to Module Screen, Block Configuration • Screen (P6 ) , Block Configuration • Screen (P16 /P20) , Block Configuration - Block : 2 x 4 Cabinet , Y8 Board is able to control - Block : 10 x 4 Cabinet , Y8 Board is able to control upto up to 8th(2x4) Cabinet 40th(10x4) Cabinet...
  • Page 46 2. Installation : Cable Connections ① Y8 to Module Data cable Connection (3x4 Cabinet) - 1) As shown in the figure below, the Y8 board (VG-XACMBKIT) for Forward Path is used for the 1 cabinet of the figure below, and the Y8 board for Redundant Path Connect the board (VG-XACSBKIT) to Figure 2 below.
  • Page 47 2. Installation : Cable Connections ① Y8 to Module P1~P16 : Forward connection data cable label RP1~RP16 : Data cable label for redundancy connection Note: Data cable Connection Diagram (3 x 4 Cabinet) - Data cable connection diagram of 3x4 cabinet, P1 to P16: Forward connection data cable label ①...
  • Page 48 2. Installation : Cable Connections ① Y8 to Module Note: Data cable Connection Diagram (3 x 4 Cabinet) Data cable connection diagram of 3x4 cabinet, RP1 to PR16: Redundancy connection data cable label ⑦ ⑤ Description ⑥ (RP1) (RP2) (RP3) (RP4) ⑦...
  • Page 49 2. Installation : Cable Connections ① Y8 to Module • Data cable Connection (3x4 Cabinet) - 2) Use cables ⑤ and ⑥ to connect data cables between the cabinets. The left cabinet is OUT, The right cabinet side connects to IN. ①...
  • Page 50 2. Installation : Cable Connections ① Y8 to Module • Data cable Connection (3x4 Cabinet) - 3) Caution: When securing cables, exercise caution to ensure that AC lines do not come into contact with data/power cables ① ⑤ ⑥ ② ③...
  • Page 51 2. Installation : Cable Connections ① Y8 to Module • Data cable Connection (3x4 Cabinet) - 4) Use cables ⑦ to ⑩ to connect Y8 boards to cabinets (redundant path connection). Connect the cables to OUT on the cabinet modules. ①...
  • Page 52 2. Installation : Cable Connections ① Y8 to Module • Note - If the layout of connected cabinets is not 3x4, connect cables based on the condition with the bottommost cabinets excluded. Ex) If 4 x 2 is left Ex) If 3 x 2 is left...
  • Page 53 2. Installation : Cable Connections ② Y8 to Y8 • Y8 Board to Y8 Board (Forward Connection) ① TMDS Cable Connection (VG-XACMBKIT/ENCM) : For Y8 boards that send data, connect the cables to OUT on the boards. For Y8 boards that receive data, connect the cables to IN on the boards, as shown below.
  • Page 54 2. Installation : Cable Connections ② Y8 to Y8 • Y8 Board to Y8 Board (Forward Connection) ② Serial connection (RJ45, LAN cable) (VG-XACMBKIT/ENCM) : For Y8 boards that send data, connect the cables to TX on the boards. For Y8 boards that receive data, connect the cables to RX on the boards, as shown below. <LAN cable>...
  • Page 55 2. Installation : Cable Connections ② Y8 to Y8 • Y8 Board to Y8 Board (Backward Connection) ① TMDS Cable Connection (VG-XACMBKIT/ENCM) : For Y8 boards that send data, connect the cables to OUT on the boards. For Y8 boards that receive data, connect the cables to IN on the boards, as shown below.
  • Page 56 2. Installation : Cable Connections ② Y8 to Y8 • Y8 Board to Y8 Board (Backward Connection) - ② Serial connection (RJ45, LAN cable) (VG-XACMBKIT/ENCM) : For Y8 boards that send data, connect the cables to TX on the boards. For Y8 boards that receive data, connect the cables to RX on the boards, as shown below.
  • Page 57 2. Installation : Cable Connections ③ PDS to PDS • Note: PDS data connection signal flow - When forward data signals are delivered in a single zone, the PDS boards connected to the forward-specific signal bracket are connected to half of the cabinets (Group1) and the PDS boards connected to the backward-specific signal bracket are connected to the other half (Group2).
  • Page 58 2. Installation : Cable Connections ③ PDS to PDS • PDS Board to PDS Board (Group1) - ① Serial connection (RJ45, LAN Cable connection) (VG-XACP8KIT/ENCP) : For PDS boards that send data, connect the cables to OUT on the boards. For PDS boards that receive data, connect the cables to IN on the boards, as shown below.
  • Page 59 2. Installation : Cable Connections ③ PDS to PDS • PDS Board to PDS Board (Group1) - ② Serial connection (RJ45, LAN Cable connection) : For cabinets connected to Group1, connect LAN cables to OUT on the PDS boards that send data and to IN on the PDS boards that receive data, as shown in ①.
  • Page 60 2. Installation : Cable Connections ③ PDS to PDS • PDS Board to PDS Board (Group1) - ③ Board ID Setting : To set IDs for the PDS boards connected to Group1, press the ID switches on the first and last PDS boards and specify the MODE Start ZONE...
  • Page 61 2. Installation : Cable Connections ③ PDS to PDS • PDS Board to PDS Board (Group2) - ① Serial connection (RJ45, LAN cable connection) (VG-XACP8KIT/ENCP) : For PDS boards that send data, connect the cables to OUT on the boards. For PDS boards that receive data, connect the cables to IN on the boards, as shown below.
  • Page 62 2. Installation : Cable Connections ③ PDS to PDS • PDS Board to PDS Board (Group2) - ② Serial connection (RJ45, LAN cable connection) : For cabinets connected to Group1, connect LAN cables to OUT on the PDS boards that send data and to IN on the PDS boards that receive data, as shown in ①.
  • Page 63 2. Installation : Cable Connections ③ PDS to PDS • PDS Board to PDS Board (Group2) - ③ Board ID Setting : To set IDs for the PDS boards connected to Group1, press the ID switches on the first and last PDS boards and specify the MODE.
  • Page 64 2. Installation : Cable Connections ④ PC Box - Y8, PDS, Light Sensor • PC box to Y8 Board (Connecting directly PC box Without Signal B’d) - If you do not install Signal B’d, connect directly from PC box as follows. LAN Cable 1st Y8 Board Port 1...
  • Page 65 2. Installation : Cable Connections ④ Signal B’d - Y8, PDS, Light Sensor • Signal Board to Y8 Board (Connecting using Signal B’d) - Using the Serial Server in Signal Bracket, Connect the CAT5-to-Serial adapter + LAN cable to Serial IN [RX] and TMDS cable to primary TMDS [IN] port of the first.
  • Page 66 2. Installation : Cable Connections ④ Signal B’d - Y8, PDS, Light Sensor • Signal Board to PDS Board - Using the Serial Server in Signal Bracket, Connect the CAT5-to-Serial adapter + LAN cable to the [IN] port of the first PDS board. Signal Board Signal Board DSUB9...
  • Page 67 2. Installation : Cable Connections ④ Signal B’d - Y8, PDS, Light Sensor • Signal Board to Light Sensor - Using the Serial Server in Signal Bracket, Connect the CAT5-to-Serial adapter(Port2) + LAN cable to [INPUT] port of Power Injector and connect Light Sensor to [OUTPUT] port of Power Injector using LAN cables.
  • Page 68 2. Installation : Power Connections • Precautions for connecting the power cables - When using 110V / 220V, the XPR product has a different number of power connections for each model, so the number of power connections corresponding to the installation model must be observed. - When connecting more than the allowed number of power connections, the power breaker may be lowered or the product may be damaged due to overcurrent - The connection must be below the quantity, and we are not responsible for any problems that occur in excess of...
  • Page 69 - When connecting AC Junction Box in the distributor, check whether there is an error on the third phase. ※ AC Junction BOX is not provided by Samsung, so separate purchase is required, SI needs to purchase Junction BOX which can IP68, AWG 12. ※ AC Junction BOX makes it possible to be located inside the cabinet.
  • Page 70 2. Installation : Power Connections Power connection Cap detachment Cable Gland 조립 Example Fig.7 Power / Data cabling position Fig.8 Power cable connection 7) Remove the cap at the bottom of the back of the cabinet and assemble the cable gland between the power cable connections.
  • Page 71 2. Installation : Power Connections • Precautions When Connecting Cable - When connecting AC power, connect as follows. Rotate and disconnect the AC power In the direction of the arrow on the connector when in the direction indicated by the cable. connecting AC power, You have to fit it in (You have to push it until it clicks) - When connecting the cable, the closed surface of the cable handle must be assembled in accordance with the connector pin direction.
  • Page 72 2. Installation : Power Connections • Power cable connection guide (for P8, 220 V) (VG-XACP8KIT/ENCP) - 1) Use an AC junction board to connect the power connection line on the distribution board to the supplied power cable. Next, ※ Note that AC Junction Board is a separate item, using IP68 / AWG12 connect the power cable to cabinet #1.
  • Page 73 2. Installation : Power Connections • Power cable connection guide (for P8, 220 V) (VG-XACP8KIT/ENCP) - 2) Connect the supplied power cables between cabinets #1 and #2, #2 and #3, and #3 and #4. Make sure the total number of connected cabinets does not exceed four. Unconnected the AC port ②...
  • Page 74 2. Installation : Power Connections • Power cable connection guide (for P8, 220 V) - 3) Follow steps 1) and 2) above to connect cabinets #5 to #8 together. When connecting the power supply, make sure the power size tolerable by the distribution board is not exceeded. (Single cabinet power for P8: 1000 W) Unconnected the AC port ②...
  • Page 75 2. Installation : Power Connections • Power cable connection guide (for P8, 220 V) - 4) Follow steps 1) to 3) above to connect cabinets #9 to #16 together. ② Breaker type: 30 A, D-Type Component Item name Description type Power cable ※...
  • Page 76 2. Installation : Power Connections (Internal Fan) ◇ Internal FAN ② ① PDS board Internal Fan (Rear of caninet view) In the case of a cabinet to which internal fan is connected, Internal fan power must be connected to the upper cabinet. Please refer to the figure below and connect the power.
  • Page 77 2. Installation : Waterproof Accessories Assembly Waterproof Accessories Assembly This is the last step in the cabinet installation and install the following accessories on the outermost face of the screen.. Cover Cap Cover Cap Cover Fan Cover Fan PC Cap PC Bot PC Handle (rubber)
  • Page 78 2. Installation : Waterproof Accessories Assembly Waterproof Accessories Assembly This is the last step in the cabinet installation and install the following accessories on the outermost face of the screen.. - Quantity of Materials per 1 Box Cover Cap Cover Cap Cover Fan Cover Fan PC Cap...
  • Page 79 2. Installation : Waterproof Accessories Assembly Cover Cap Cover Cap Cover Fan Cover Fan PC Cap PC Bot (rubber) (plastic) Bottom Sheet Sheet PC Bot Sheet Cover Fan Bottom Attach the sheet to the location where the cover fan bottom is assembled. ※...
  • Page 80 2. Installation : Waterproof Accessories Assembly Cover Cap Cover Cap Cover Fan Cover Fan PC Cap PC Bot PC handle (rubber) (plastic) Bottom Sheet Sheet Sheet Cover Cap (Plastic) PC Cap sheet Disassemble 45° Remove sheets Disassemble if other caps are assembled. ※...
  • Page 81 2. Installation : Waterproof Accessories Assembly Cover Cap Cover Cap Cover Fan Cover Fan PC Cap PC Bot PC handle (rubber) (plastic) Bottom Sheet Sheet Sheet Cover Fan Top Cover Cap (Rubber) The dug side is left and right. SCREW(M4,L12, rubber) BN81-19153A ※...
  • Page 82 2. Installation : Waterproof Accessories Assembly Cover Cap Cover Cap Cover Fan Cover Fan PC Cap PC Bot PC handle (rubber) (plastic) Bottom Sheet Sheet Sheet PC Handle Sheet Remove sheet Attach it to the cabinet handle from the outside.
  • Page 83 2. Installation : Protect Frame Assembly(Optional) Attaching protection frames for the outer cabinets on the screen Tool & Kit Box Aluminum, Black anodizing Corner Top L Frame Top Corner Top R x 1 = 4 Cabinet Frame On the outer surface of the cabinet located on the Left outer line of the screen.
  • Page 84 2. Installation : Protect Frame Assembly(Optional) Top/Bottom Protection Frame M8L35 M8L12 Push 1. Locate the Cabinet that needed to install Frame Bottom 2. Open Cover Rear of that Cabinet 3. Attached Frame Bottom to bottom face of cabinet, align it along front surface. 4.
  • Page 85 2. Installation : Protect Frame Assembly(Optional) Left/ Right Protection Frame 1. Locate the Cabinet that needed to install Frame Left or Right 2. Assemble Stud-pem to that cabinet 3. Attached Frame Left/Right to cabinet, align it along front surface. 4. Assembly Frame Bottom to cabinets by 2EA M4L12 screw...
  • Page 86 2. Installation : Protect Frame Assembly(Optional) Protection Frame extension M4L6 Ex: 2x2 cabinet 1. Install Cover Frame Top/Bottom from left to right 2. Install Cover Frame Left/Right from bottom to top 3. Use 2EA M4L6 screw to connect between Cover Frame...
  • Page 87 2. Installation : Protect Frame Assembly(Optional) Protection Frame Bracket Link M4 screw Release these screws M4L6 screw M4L12 screw 1. Remove Bracket Link from Cover Rear at corner point by release M4 screw: Frame Top/Bottom at right end, Frame Left/ Right at top end. 2.
  • Page 88 3. Accessory Kit : Tools & Materials Samsung supply tool (Frame Kit accessory VG-XABS8KIT/EN ) T-HANDLE HEX TOOL HEX KEY ◇ The tool that the SI needs to prepare Mechanical installation tool Installation material Electronic installation tool M12 L30 washer bolt...
  • Page 89: Accessory Kit

    3. Accessory Kit Accessory BOX (Separate purchase item) Accessory components vary depending on the installation model's environment, refer to the separate VPS accessory box manual The selection of the Accessory Box also depends on whether you want to install it or not Image Label Accessary...
  • Page 90 3. Accessory Kit Accessory information (Separate purchase item) . Frame Kit accessory (VG-XABS8KIT) (per 1 set) BRACKET FRAME BRACKET FRAME COVER BOTTOM COVER TOP CAP PC SHEET COVER CAP (RUBBER) BOTTOM LEFT BOTTOM RIGHT 32EA 32EA 32EA 40EA BN81-19514A BN81-19513A BN81-19162A BN63-18387A BN61-16554A...
  • Page 91 3. Accessory Kit Accessory information (Separate purchase item) . Fan Kit accessory (VG-XAFAHKIT) (per 1 set) INTAKE FAN EXHAUST FAN FILTER INTERNAL FAN PC SHEET BN81-19505A BN81-19506A BN63-19239A BN81-19507A BN81-19161A EXTERNAL FAN CABLE INTENAL FAN CABLE SCREW(M4,L20) SCREW(M4,L6) BN39-02521A BN81-18715A BN81-19152A BN81-19151A...
  • Page 92 3. Accessory Kit Accessory information (Separate purchase item) . Control Main accessory (VG-XACMBKIT) (per 1 set) Y8 CONTROL BOARD BRACKET SUPPORT SCREW(M4,L6) TMDS HOLDER BN41-02796A BN61-16680A BN81-19151A BN81-19168A TMDS CABLE 5M Assy DATA CABLE LAN CABLE 5M Power CABLE 5EA (per code, 4 Cables) BN81-19536A BN82-02546A BN81-19537A...
  • Page 93 3. Accessory Kit Accessory information (Separate purchase item) . Control Main accessory (VG-XACNBKIT) (per 1 set) Y8 CONTROL BOARD BRACKET SUPPORT SCREW(M4,L6) TMDS HOLDER BN41-02796A BN61-16680A BN81-19151A BN81-19168A TMDS CABLE 11M Assy DATA CABLE LAN CABLE 11M Power CABLE 5EA (per code, 4 Cables) BN81-18713A BN82-02546A BN81-18714A...
  • Page 94 3. Accessory Kit Accessory information (Separate purchase item) . Control Redundant accessory (VG-XACSBKIT) (per 1 set) Y8 CONTROL BOARD BRACKET SUPPORT SCREW(M4,L6) TMDS HOLDER BN41-02796A BN61-16680A BN81-19151A BN81-19168A TMDS CABLE 5M Assy DATA CABLE LAN CABLE 5M Power CABLE 5EA(per code, 4 Cables) BN81-19536A BN82-02549A BN81-19537A...
  • Page 95 3. Accessory Kit Accessory information (Separate purchase item) . Control Redundant accessory (VG-XACRBKIT) (per 1 set) Y8 CONTROL BOARD BRACKET SUPPORT SCREW(M4,L6) TMDS HOLDER BN41-02796A BN61-16680A BN81-19151A BN81-19168A TMDS CABLE 11M Assy DATA CABLE LAN CABLE 11M Power CABLE 5EA(per code, 4 Cables) BN81-18713A BN82-02549A BN81-18714A...
  • Page 96 3. Accessory Kit Accessory information (Separate purchase item) . Power Cable & Misc. accessory (VG-XACP8KIT) (per 1 set) POWER CABLE MASTER POWER CABLE LAN CABLE DATA CABLE COVER CAP (RUBBER) END CAP 8+8EA BN39-02537A BN39-02536A BN81-18712A BN82-02556A BN63-18387A BN81-19336A BN82-02557A CAP PC SHEET COVER CAP HANDLE PC SHEET...
  • Page 97 3. Accessory Kit Accessory information (Separate purchase item) . Protection Frame (VG-XAFV4KIT) (per 1 set) COVER-FRAME LEFT COVER-FRAME RIGHT GUIDE PIN SCREW(M4,L6) SCREW(M4,L12) 20EA 22EA BN81-19508A BN81-19509A BN81-19171A BN81-19169A BN81-19170A BACKET CORNER BACKET CORNER BACKET CORNER BACKET CORNER L BRACKET M8 BOLT + BOT LEFT BOT RIGHT...
  • Page 98 3. Accessory Kit Accessory information (Separate purchase item) . Protection Frame (VG-XAFH4KIT) (per 1 set) COVER-FRAME BOT COVER-FRAME TOP BN81-19511A BN81-19510A Bolt (M8,L35) Bolt (M8,L12) SCREW (M4,L6) 20EA BN81-19172A BN81-19173A BN81-19169A...
  • Page 99 3. Accessory Kit Accessory information (Separate purchase item) . Signal Board accessory (VG-XASBKIT) (per 1 set) Serial Server Serial Adapter HDMI Fiber Receiver BN81-19180A BN81-13912A BN81-17558A Ethernet Media Converter 3M Fiber Jumper 1M Fiber Jumper BN81-15094A BN81-13643A BN81-13642A 5 volt PSU 12 volt PSU LAN Cable BN81-17909A...
  • Page 100 3. Accessory Kit Accessory information (Separate purchase item) . Signal Box accessory (VG-XACBKIT) (per 1 set) Serial Server Serial Adapter HDMI Fiber Receiver Fiber Enclosure BN81-19180A BN81-13912A BN81-17558A Ethernet Media Converter 3M Fiber Jumper 1M Fiber Jumper L-Com enclosure BN81-15094A BN81-13643A BN81-13642A 5 volt PSU...
  • Page 101 3. Accessory Kit Accessory information (Separate purchase item) . PC BOX accessory (VG-PCZBKIT) (per 1 set) iBase AGS PC Windows 10 LTSB Power Injector Fiber Enclosure BN81-17540A BN81-15702A BN94-13069A 12 volt PSU DisplayPort to VGA RJ45 to DB9 Serial L-Com enclosure adapter BN81-17910A BN81-13793A...
  • Page 102 4. Control Room Setting : System Configuration ※ Note : Control room - This refers to a room where you can control and monitor the screen when installing a sports space or a large outdoor screen. - If control room is provided, installation can be done using Signal Box. - If the control room is not available, such as on the highway, install it using the PC Box.
  • Page 103 4. Control Room Setting : System Configuration (With Control Room) Total system configuration (※ With Control Room) FBR : Fiber LED SCREEN MC : Media Converter Control Room Y8 Board Signal Bd TMDS MC TMDS MC Fiber MC Fiber MC Optical PDS Board TMDS MC...
  • Page 104 4. Control Room Setting : System Configuration (Without Control room) Total system configuration (Without Control room) LED SCREEN PC BOX Y8 Board Control Serial Server TMDS Cable Power Distribution LAN Cable Power Cable...
  • Page 105 4. Control Room Setting : System Configuration (Without Control room) Total system configuration (Without Control room) LED SCREEN LED SCREEN PC BOX HDMI Cable Y8 Board (Forward) LED Control PC HDMI Distributor PDS Board LAN Cable (Forward) Control LAN Cable (Forward) LAN Cable HDMI Cable...
  • Page 106: Control Room Setting

    4. Control Room Setting Control Room - On the LED Control PC, install the System Matrix, PV System and Processor. ※ Please contact SI for further information regarding use and. connection Control Room TMDS MC FBR MC TMDS MC FBR MC Media Player ETH1 ETH2...
  • Page 107 4. Control Room Setting - ① Serial Server Setting : Set the IP address for the Control PC to enable a connection with the Serial Server. Next, in the Internet Explorer address bar, enter the Serial Server IP address to access the settings screen. (→ Click the Login button. You do not need to enter a password.) Serial Server CAT5 to Serial...
  • Page 108 4. Control Room Setting - ② Serial Server Setting : Configure settings for each port (ports 1 to 4), as shown below. (Mode: RS-422 (4-wire) / Baud Rate: 115200) Press “Save.” The Serial Server automatically reboots. (The reboot process takes about 15 seconds to complete.)
  • Page 109 4. Control Room Setting : System Matrix Overview of System Matrix software - The System Matrix software is designed to control multiple LED displays. With this software, you can control multiple displays of different sizes and pixel pitches. - Use the “Setup System Matrix (20-04-0802x64).msi” file to install the System Matrix software. After the software is installed, the software shortcut appears on the Start menu.
  • Page 110 4. Control Room Setting : System Matrix System Matrix program setting - Set the value for the XPR model on the Settings – Output Settings screen of the main screen ※ When connecting to Redundant Y8 board : Choose Dual Interface and change the Redundant Y8 board DIP Switch DUAL : ON...
  • Page 111 4. Control Room Setting : System Matrix System Matrix Program setting From the top menu of the main screen [Location], set Country / Region / City to suit the installation location *Normally, set to automatically adjust the brightness according to the Sunrise / Sunset time. ※...
  • Page 112 4. Control Room Setting : System Matrix System Matrix program setting Add the Controllers and Displays you want to control from the menu [Manage Systems] at the top of the main screen.
  • Page 113 4. Control Room Setting : System Matrix System Matrix program setting - Connect the added controller and display to each other.  Click and drag the mouse over the Display Area while you click on the appropriate Controller Area.  After confirmation of link, click Save & Exit. linked ※...
  • Page 114 4. Control Room Setting : System Matrix System Matrix program setting - The Controller window appears, and for detailed setup, click the Setting button.
  • Page 115 4. Control Room Setting : System Matrix System Matrix program setting - Click the ‘configure output layout’ button the Layout button to set the value for the associated screen layout. (example) Configure 2x2 Cabinet screens with 2 Y8...
  • Page 116 4. Control Room Setting : System Matrix System Matrix program setting - On the Communications Settings screen, enter the Serial Server connection information. (Connected Serial Server IP address : insert Port) Redundant Y8 Master Y8 Light Sensor Number of connected PDS...
  • Page 117 4. Control Room Setting : System Matrix System Matrix basic functions overview Dimming Manually control display brightness/Set brightness automatic control via Light Sensor Global Control Screen output control, simple screen brightness control. Serial Colors Use for troubleshooting purposes such as print test pattern and video signal, color uniformity, etc. Global Setting Schedule the video contents Diagnostics...
  • Page 118 4. Control Room Setting : System Matrix System Matrix basic function ◎ Dimming This feature allows you to control display brightness manually, or 50 automatically through the Light Sensor. - General Output : Display brightness is always maintained at the value set by this function. (1) Open Setting window Click the 'Settings' button in the main window of the program.
  • Page 119 4. Control Room Setting : System Matrix System Matrix basic function - Light Sensor : The light sensor automatically adjusts the brightness to match the lighting conditions around the display. (1) Open Setting window Click the 'Settings' button in the main window of the program. (2) Dimming menu Select 'Dimming' from the drop-down menu in the upper left corner of the Setting window.
  • Page 120 4. Control Room Setting : System Matrix System Matrix basic function - Output % : The function sets the display brightness minimum / maximum. (1) Open Setting window Click the 'Settings' button in the main window of the program. (2) Dimming menu Select 'Dimming' from the drop-down menu in the upper left corner of the Setting window.
  • Page 121 4. Control Room Setting : System Matrix System Matrix basic function - Dimming Schedule : When using this function, System Matrix adjusts brightness according to the dimming schedule set. (1) Open Setting window Click the 'Settings' button in the main window of the program. (2) Dimming menu Select 'Dimming' from the drop-down menu in the upper left corner of the Setting window.
  • Page 122 4. Control Room Setting : System Matrix System Matrix basic function ◎ Global Control / Serial Colors / Global Settings / Diagnostics...
  • Page 123 4. Control Room Setting : System Matrix System Matrix basic function ◎ Global Control - Blanking This function allows you to stop the display's screen output without turning off the set power. This means that the user can temporarily dim all displays and output them again while power is being applied..
  • Page 124 4. Control Room Setting : System Matrix System Matrix basic function - All On / All Off : The function allows you to turn off and turn on the display. (LED Module Power on/off) (3) Toggle Power Click the 'All Off' button in the Global Control window. Click the 'All On' button to turn on Module power again.
  • Page 125 4. Control Room Setting : System Matrix System Matrix basic function ◎ Serial Color Test Patterns : The Test Pattern setup feature sends a specific color or test pattern to the Display over a serial connection. It is mainly used for troubleshooting purposes, and color uniformity can be checked. ※...
  • Page 126 4. Control Room Setting : System Matrix System Matrix basic function ◎ Global Setting - Blanking Schedule The function allows you to stop the display output at the specified time zone. (→between the first and second designated time) This feature stops display output at any time of night.
  • Page 127 4. Control Room Setting : System Matrix System Matrix basic function ◎ Diagnostics : These features enable monitoring and diagnosis of product status. Data about the power supply status, each pixel, module/Y8 status, and PDS diagnostic functions are displayed, and the temperature of the product can also be monitored.
  • Page 128 4. Control Room Setting : System Matrix System Matrix basic function ◎ Diagnostics Module 진단 상태 확인...
  • Page 129 4. Control Room Setting : System Matrix System Matrix basic function ◎ Diagnostics → When you check Show problems, detail information are appear . Check the Module F/W Version Check the Y8 F/W Check the Module Version Temperature...
  • Page 130 4. Control Room Setting : System Matrix System Matrix basic function ◎ Power Status - PDS diagnostics (1) PDS Diagnostics function Double-click on the Power Status area of the System Matrix main window.
  • Page 131 4. Control Room Setting : System Matrix System Matrix basic function ◎ Power Status - PDS Diagnostics You can monitor ID, F/W version, FAN status, temperature, Y8/module status of PDS, and perform FAN on/off, Y8 on/off, module on/off, and F/W update functions through Commands function.
  • Page 132 4. Control Room Setting : System Matrix System Matrix basic function ◎ Power Status – PDS Control (2) PDS Control function Commands – You can select Fan Control to adjust Top/Rear Fan On/Off and Speed. (Stage 2 Fan Speed Adjustment – Low / High)
  • Page 133 4. Control Room Setting : System Matrix System Matrix basic function ◎ Power Status – PDS Control (2) PDS Control function Commands – You can select Auto / Manual mode by selecting Control Mode. • Auto : Mode for automatically adjusting Fan speed according to reference temperature •...
  • Page 134 4. Control Room Setting : System Matrix System Matrix basic function ◎ Power Status – PDS Control (2) PDS Control Function Commands – You can update the PDS firmware by selecting Update Firmware. (L-XPRMWWAC-****.*.srec)

This manual is also suitable for:

Lh080xprzas/pz