Download Print this page

Samsung XPR Series Installation Manual page 27

Outdoor led, standard cabinet

Advertisement

2. Installation : Handling Cabinets
◇ How to make section (ex 4x2)
M8 L18 BOLT
Tighten the brackets against the top and bottom of the two cabinets
with bolts.
X seam
M8 L18 BOLT
Cabinet to be
extended
Tighten the two cabinets directly from inside the cabinet with bolts.
(doors open) At the same time, adjust the Z-seam based on the
LED modules on the front.
And repeat the 1stpes up to here about lateral extension
M8 L18 BOLT
Z seam
C
B
N
C
B
N
27

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Lh080xprzas/pz