Operation; Notes On Safety For The First Start-Up; Adjustment Before First Firing; Burner Start-Up - Riello RX80 S/PV Installation, Use And Maintenance Instructions

Premixed gas burners
Table of Contents

Advertisement

Available languages

Available languages

6

Operation

6.1

Notes on safety for the first start-up

The first start-up of the burner must be carried out
by qualified personnel, as indicated in this manual
and in compliance with the standards and regula-
tions of the laws in force.
WARNING
Check the correct working of the adjustment, com-
mand and safety devices.
WARNING
6.2

Adjustment before first firing

The following to be made are:
 Open the manual valves located upline from the gas train.
 Bleed the air from the gas pipes.
6.3

Burner start-up

Switch on the burner's power and close the thermostat.
The burner starts in pre-purging mode at top speed. Speed sub-
sequently decreases to the START value and the burner fires.
If however the fan starts up but no flame has appeared at the end
of the safety period, the burner goes into lockout.
Reset and wait for a new start-up attempt.
If the burner still does not fire, the problem may be that gas is not
reaching the combustion head within the 3-second safety time.
Turn screw V1 (Fig. 7) on the gas valve mixer anticlockwise
slightly.
Once the burner has fired, the next step is to complete the burn-
er's other adjustments.
6.4

Fan adjustment

Modulation is based on variable-speed technology. Combustion
air delivery can be adjusted by varying the motor's speed (rpm).
The proportioning gas train, depending on the pressure detected
in the purging circuit, delivers the right amount of fuel.
Hence the output delivered is adjusted by varying the motor's
speed of rotation. Motor speed can be adjusted by means of the
three Trimmers (Fig. 10).
6.5

Gas valve adjustment

The regulation of the gas delivery is achieved using the two
screws V1 and V2.
To vary the maximum gas delivery turn screw V1.
To increase the delivery: turn the screw in anticlockwise di-
rection (unscrew).
To reduce the delivery: turn the screw in clockwise direction
(screw up).
To vary the minimum gas delivery act on the screw V2 on the gas
valve.
Remove the protective screws and turn the screw inside with an
allen spanner.
20017376
Operation
To increase the delivery: turn the screw in clockwise direction
(screw)
To reduce the delivery: turn the screw in anticlockwise direc-
tion (unscrew)
Definition of the fan adjustments:
The adjustments are made by adjusting the three potentiometers
on the control box.
Determines the air in the start phase
STAR:
(3480 ÷ 5520 rpm)
Determines the modulation minimum
MIN:
(1600 ÷ 2500 rpm)
Determines the modulation maximum
MAX:
(4500 ÷ 6600 rpm)
The adjustment of "MIN" immediately cuts in at the end of the pre-
purging delineated from the opening of the valve and the pres-
ence of the discharge.
The enabling of the maximum modulation with "MAX" happens
every 10 sec from the opening of the valve.
Maximum output
D9713
12
GB
Minimum output
Fig. 10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rx100 s/pvRx120 s/pv200154862001583720015840

Table of Contents