6.6

Burner adjustment

To achieve optimal burner adjustment, the flue gases produced
by combustion must be analysed as they leave the generator. In
conformity with Efficiency Directive 92/42/EEC, the burner must
be applied to the generator, adjusted and tested in compliance
with the instruction manual of the generator in question, including
checking of CO and CO
concentration in flue gases and their
2
temperature.
Check in this order:
 Maximum output
 Minimum output
 firing output
The maximum output must correspond with the the output re-
quired by the boiler used. To increase or decrease its value, ad-
just trimmer MAX on the control box (Fig. 10).
Measure the gas delivery on the contactor to precisely establish
the burnt output.
Using a smoke analyser, measure the value of the CO
in order to optimise the burner calibration.
The correct values are: CO
To correct these values act on thee gas valve in the following
way:
To increase the gas delivery and the CO
in anticlockwise direction (unscrew)
To reduce the gas delivery and the CO
a clockwise direction (screw up)
The minimum output must correspond with the the output re-
quired by the boiler used. To increase or decrease its value, ad-
just trimmer MIN on the control box (Fig. 10).
Measure the gas delivery on the contactor to precisely establish
the burnt output.
Using a smoke analyser, measure the value of the CO
in order to optimise the burner calibration.
The correct values are: CO
To correct these values act on thee gas valve in the following
way:
To increase the gas delivery and the CO
in a clockwise direction (screw up)
To reduce the gas delivery and the CO
an anticlockwise direction (unscrew)
Firing output must come to approx. 70-80% of the maximum
output.
To increase or decrease its value, adjust trimmer START on the
control box (Fig. 10).
The burner is supplied for the G20 operation (Methane gas).For
the conversion to G30-G31 (only for models RX100-120 S/PV) it
is necessary to order the relevant diaphragms kits according to
the indications in Tab. B.
Diaphragm
Gas categories
øi (mm)
G20
G25
G30
G31
Tab. B
8.5-9% or O
5-5.5%.
2
2
: turn the screw V1
2
: turn the screw V1 in
2
8.5-9% or O
5-5.5%.
2
2
: turn the screw V2
2
: turn the screw V2 in
2
Kit code
10,6
premounted
-
-
7,2
20018124
7,8
20018123
Operation
or the
O
2
2
or the
O
2
2
13
GB
20017376

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rx100 s/pvRx120 s/pv200154862001583720015840

Table of Contents