Huawei RP100 Commissioning Manual page 38

Room presence
Hide thumbs Also See for RP100:
Table of Contents

Advertisement

HUAWEI RP100&RP200 Room Presence
Commissioning Guide
Step 5 Keep the arrows on the horizontal bars facing inward and arrows on the L and R bars pointing
towards the top of the HD displays. Place the supports on the rear of the HD displays, as shown
in
Figure
Figure 3-22 Placing the supports on the rear of the HD displays
Step 6 Align the HD display holes with the holes silk-screened with the number that matches the HD
display model on the L and R bars, as shown in
Figure 3-23 Aligning supports
Step 7 Fasten the eight M6 x 20 hex socket screws using an H5 Allen wrench to securely attach the
supports to the rear of the HD displays.
Step 8 Install the mounting components on the connecting bars, as shown in
Issue 01 (2015-02-12)
3-22.
NOTE
l If you are using 46-inch HD displays, align the HD display holes with the holes silk-screened with 1
on the L and R bars.
l If you are using 55-inch HD displays, align the HD display holes with the holes silk-screened with 2
on the L and R bars.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
3-23.
Figure
3 Installation
3-24.
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rp200Rp100-46sRp100-55sRp200-46sRp200-55s

Table of Contents