Friedrich VRP Series Installation & Operation Manual page 20

Variable refrigerant packaged heat pump
Hide thumbs Also See for VRP Series:
Table of Contents

Advertisement

Final Unit Installation Overview
Unit Final Placement - Front Install
1)
Ensure that power if off at the junction box feeding power to the air conditioner until all process steps are
completed.
2)
Move the unit from the shipping base and onto the installation site.
3)
Insert the unit's rear extension into the wall plenum. There should be approximately 2" of penetration of the
unit into the wall plenum, resulting in a complete seal all around.
4)
Identify the appropriate drain port to use and complete plumbing (See Page 22).
5)
Attach the ductwork to the unit at the supply-air outlet and ensure the seal is air tight (See Page 23).
6)
Wire and connect the wall controller (See Pages 24-27).
7)
Connect the main power (See Page 28).
20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrp12kVrp12rVrp24kVrp24r

Table of Contents