Pcbs - Daikin FTKS09JV2S Service Manual

Removal procedure, 2.0/2.2/2.5/2.8/3.5/3.6/4.1/4.2/4.6/ 5.0 kw class, 7000/9000/12000/15000 btu/h class
Table of Contents

Advertisement

PCBs

7. PCBs
Warning
Step
1. Remove the shield plate.
1
The figure shows the
parts of the electrical
box.
2
Unfasten the 2 hooks
(upper).
3
Unfasten the hook
(back).
4
Lift up the shield plate
to unfasten the 2 hooks
(lower).
2. Remove the signal
receiver unit.
1
Unfasten the 3 hooks.
2
Unfasten the hook on
the opposite side.
10
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Procedure
(Front)
Signal receiver unit
Shield plate
Signal receiver unit
(R21135)
Hook (upper)
Shield plate
Hook (back)
Hook (lower)
(R21136)
(Back)
(R21137)
Hook
(R17703)
Si041252EE
Points
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents