Oxgard Cube C-01 Installation Manuallines

Oxgard Cube C-01 Installation Manuallines

Hide thumbs Also See for Cube C-01:

Advertisement

Quick Links

Installation
guidelines
Cube С-01 turnstile
www.oxgard.com
info@oxgard.com
Tel.+7(812) 366-15-94

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Cube C-01 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Oxgard Cube C-01

  • Page 1 Installation guidelines Cube С-01 turnstile www.oxgard.com info@oxgard.com Tel.+7(812) 366-15-94...
  • Page 3: Table Of Contents

    CONTENTS List of abbreviations used ................4 2. Product Design ..................6 3. Safety requirements ................11 4. Installation of a turnstile ................. 12 4.1. Required equipment ................. 12 4.2. Installation of a turnstile ..............13 5. Connecting turnstile ................16 5.1.
  • Page 4: List Of Abbreviations Used

    List of abbreviations used – Power Supply – Security and Fire Alarm System SFAS – Access Control System – normally connected – normally opened Firmware version of turnstile FW Cube v 1.2 Cube С-01 turnstile...
  • Page 5 Basic specifications Table 1. General Specifications Specification Turnstile Panel Overall dimensions(H х W х D), mm: 1024х800х900 107х107х25 -in operating condition 1024х200х361 -with fold down arms Weight, kg Temperature range, °С: -operation +1...+40 +1...+40 -transportation and storage +1...+40 +1...+40 Relative humidity, %, no more Passage width, mm Throughput, person/min Lifetime, years...
  • Page 6: Product Design

    2. Product design Turnstile housing Turnstile housing and blocking arms are made of brushed stainless steel. In the middle part of the housing there is a dismountable bent plate made of stainless steel for quick access to the cross-board for connection of cables PS, remote control panel and ACS.
  • Page 7 Fig.1. General View and Overall Dimensions of Turnstile Installation guidelines...
  • Page 8 ATTENTION! To log passages during turnstile operation under ACS control and to avoid unauthorized passages, it is required to arrange passage zones as per Fig.2. Blocking Планка ограждения Fence Ограждение Не более No more than 50 мм 50 mm 200 мм min 200 mm Recommended installation diagram Not recommended installation diagram Fig 2.
  • Page 9 Турникет Ограждение 6 град 6 degrees град. Fig. 3. Possible free movement of the arm, in “STOP” mode Indication panel Indication panel of the turnstile is located at the upper part of the turnstile behind the insert made of acryl glass. Operation modes of the turnstile are displayed on the panel in form of mnemonic signs depicting authorization and non-authorization of passage (Fig.4).
  • Page 10 Sign prohibiting passage Sign permitting passage Fig.4.Appearance of indication panel Control panel Housing of remote control panel is made of brushed stainless steel. In the front there are control buttons 1 - 4 and LEDs indicating operation modes of the panel (Fig.5). Standard cable length, included in the delivery set, is 5 meters Light Emitting Diodes (LEDs)
  • Page 11: Safety Requirements

    3. Safety requirements ATTENTION! A failure to observe safety requirements, indicated in this Section, may cause damage to life and health of people, complete or partial loss of operating capability of the product and (or) auxiliary equipment. ATTENTION! The manufacturer shall disclaim the liability for causing injury to human life and health complete or partial loss of operating capability of the product and (or) auxiliary equipment in case of a failure to observe safety requirements, indicated in this Section, and will...
  • Page 12: Installation Of A Turnstile

    4. Installation of a turnstile ATTENTION! The turnstile should be installed securely to avoid swinging and (or) overthrow during operation. In case of installation on the low strength floors - take action to strengthen the floor at the installation site. Before checking operability of the turnstile carefully read this section of the Guidelines.
  • Page 13: Installation Of A Turnstile

    4.2. Installation of turnstile 4.2.1. Prepare horizontal surface at the installation site of the turnstile. 4.2.2. Prepare cable conduit coming from the site to the installation area of PS, remote control panel, and as well, if it is required, to the connection point of ACS and SFAS.
  • Page 14 Hole 1 for control cable inlet Cross-section 0-0 4 packages 4 holes 4 holes 4 radii Fig. 6. . Installation dimensions (Provided a drawing of the bottom support of the turnstile) 4.2.7. Mount the turnstile housing to the prepared site (Fig.6). Put remote control panel, PS and, if necessary, ACS and SFAS cables to the turnstile housing.
  • Page 15 Fig.7. Installation diagram of the turnstile 4.2.8. Match the holes in the turnstile support (1, Fig.7) with the anchors in the floor. Check verticality of the installation in 2 planes, if necessary use steel gaskets of the required thickness for right installation of the turnstile.
  • Page 16: Connecting Turnstile

    5. Connecting turnstile: PS, remote control panel and ACS connection is carried out with a cross-board. For this it is required to unscrew 2 self-drilling screws located on the turnstile rack and remove dismountable bent plate made of stainless steel for quick access to the turnstile cross-board (Fig.8). Fig.8 shows the cross-board arrangement on the turnstile rack.
  • Page 17 Fig.9. External View of the Cross-board Table 3.Operation modes of a turnstile Jumper position Operating mode of the turnstile J1 removed Pulse mode (see i.5.3.) J1 installed Potential mode (see i.5.3.) J2 installed Turnstile does not react to the control panel instructions, button status translated to the outputs I/O1...I/O4 (see i.5.4) J2 removed...
  • Page 18: Power Connection

    5.1. Power connection ATTENTION! It is prohibited to use power units with output current less than 1.5А. It is not recommended to install a power unit at a distance more than 25 m off the turnstile. ATTENTION! It is prohibited to connect turnstile power with a cable with cross-section less than 1.5 mm .
  • Page 19: Connecting Control Panel

    5.2. Connecting Control Panel Remote control panel shall be connected to the Control Board group of contacts located on the cross-board. The contacts will have to be marked as follows: 12V, CL, CH, GND. Remote control panel connection shall be made on the basis of contact marking, provided in Table 4.
  • Page 20 Table 5. ACS contact assignment Marking of contacts Contact assignment One-pass movement to the left/to the right LEFT, RIGHT (lowest priority) No Entry (“Stop” mode) STOP (medium priority) "Antipanic" mode – passage is authorized in both directions (highest priority) Common contact Inputs for ACS connection will have to be identified by means of priorities: AР...
  • Page 21 ATTENTION (!) In case of one of STOP and (or) АР inputs are closed, the instructions coming from the control panel will not be received as ACS has the higher priority. STOP and AP inputs are potential ones, i.e. until the input is at GND contact, the turnstile is operating in the corresponding mode, after the contacts are opened the turnstile changes over to “Stop”...
  • Page 22 At the cross-board there is a relay output for ACS, working on “dry contact” principle – Status. NO and COMM is normally opened connection, its contacts are closed only when turnstile enters “АР” mode and the diode D3 is now goes on. The following LEDs are also mounted on the cross-board: D4 that indicates a signal to the input “LEFT”.
  • Page 23 Fig. 10. Numbering of control panel buttons Table 6. Assignment of I/O contact group Contact Assignment of contacts marking Status of “Left” button (1,Fig 10) I/O1 Status of “Right” button (3,Fig.10) I/O2 Status of “Stop” button (2, Fig.10) I/O3 Status of “Antipanic” button (4,Fig.10) I/O4 Outputs I/O1...I/O3 display current status of remote control panel buttons, i.e.
  • Page 24 Outputs I/O1...I/O4 one can connect to AMCS controller both directly and via relay. When using relay the diode connection in parallel to the winding is mandatory (!) (Fig. 11). Mother- board Fig.11. Connection diagram of diode connected in parallel to relay winding Connecting diagram of remote control panel to ACS controller is shown on Fig.12.
  • Page 25 Mother- board Fig. 12. Connecting diagram of control panel to ACS controller Installation guidelines...
  • Page 26: Appendix 1. Brief Description Of Data Bus Can2.0

    Appendix 1. Summary of data bus CAN2.0 Remote control panel uses a modern jam-resistant bus of standard CAN2.0. According to the standard CAN2.0 a length of signal cable can reach the values more than one kilometer, however correct operation at such distances depends on many factors.
  • Page 27: Dimensions Of The Turnstile

    Appendix 2. Location of installation holes related to external dimensions of the turnstile Installation guidelines...
  • Page 28 Fig.13. Location of installation holes and turnstile dimensions Cube С-01 turnstile...
  • Page 29 Installation guidelines...
  • Page 30 Cube С-01 turnstile...
  • Page 31 Installation guidelines...
  • Page 32 OOO “Vozrozhdenie” 66, Sofiyskaya str., 192289, Saint-Petersburg tel./fax +7 (812) 336 15 94 www.oxgard.com info@oxgard.com...

Table of Contents