Keysight M9485A Startup Manual page 16

Pxie vector network analyzer modules
Hide thumbs Also See for M9485A:
Table of Contents

Advertisement

Getting Started
STEP 3. Install the Network Analyzer Modules
Insert the SMP-SMP connectors into the receiver's input carefully as they are very
CAUTION
sensitive and the inner conductors tend to bend.
19.Place the labels on the divider as shown in
Figure 1-10
Label for Divider
Figure 1-11
Cable Removal Tool (part number 5002-3361)
Remove the 50 ohm load from output ports used on M9340A. Other unused ports should
NOTE
be terminated.
20.Figure 1-12 on page 17
21.Figure 1-13 on page 17
on the dividers. The color in circle shows the color of the cable.
modules for 12-port configuration.
modules for 24-port
configuration.Table 1-1 on page 18
cables to make the connections.
Figure 1-10 on page 16
shows the complete cable connections between
shows the complete cable connections between
16
below,
shows the required

Advertisement

Table of Contents
loading

Table of Contents