Getting Started
STEP 3. Install the Network Analyzer Modules
In these instructions, four network analyzer modules are configured. Use these
NOTE
instructions as a general guide when installing a different number of modules.
14.When placing all the modules by the sequence, place the screws at the top
15.Fasten the modules with the screws to the chassis after the M9376-60016
16.Fasten the M9376-62006 4-way divider by ensuring that the SMP-SMP
17.Similarly, 8-port modules require 6 of the 4-way divider and 12-port
18.2-port modules have the option of using 3 of the M9376-62004 2-way
If you are using other chassis than Keysight's, you may need a routing for trigger path of
NOTE
the chassis. Refer to the M9485A FAQ page on the Keysight.com for more information
(http://www.keysight.com/find/m9485A)
Figure 1-8
Alignment Plate Installation
and bottom of each module but keep all the screws loose until all module
are properly placed.
4-Way alignment plate is installed as seen in
after the alignment plate is installed, the black plate cover should be
removed. 2-port module have the option of using M9376-60014 2-Way
alignment plate.
connectors are fit well through the alignment plate, as shown in
on page
15. 4-port modules requires 3 of the 4-way divider to be
connected.
modules require 9 of the 4-way divider.
divider.
Figure 1-8 on page
14
14. Only
Figure 1-9