INSTALLATION
2.4. FIXING TO THE FLOOR (Fig. 2.11)
- Drill the hole C and clean it (if water is used, dry
it thoroughly).
- Insert the phial B in the hole.
- Mount the drive shank E on the drill D.
- Screw the bar A onto its mouthpiece F and fi-
nally, screw the whole assembly onto the drive
shank E.
- Insert the percussion/rotary bit of the drill D
and push the bar to the bottom of hole C.
- Remove the drill D.
- Free the screw on the mouth F with the Allen
wrench H.
- Quickly unscrew and separate the mouthpiece F
from the bar A.
Do not extract the bar from the position reached
in the hole.
Ambient temperatureHardening time
-5° ÷
0° C
0° ÷ 10° C
10° ÷ 20° C
> 20° C
30 hours
60 minutes
20 minutes
10 minutes
AUFSTELLUNG
2.4. BODENBEFESTIGUNG (Abb. 2.11)
- Das Bohrloch C ausführen und es reinigen (wurde
es ausgewaschen, so ist es gut trocknen zu lassen).
- Die Ampulle B in das Bohrloch einführen.
- Die Mitnehmerstange E am Bohrer D montieren.
- Den Stab A in seiner Buchse F eindrehen und
danach auf der Mitnehmerstange E anschrauben.
- Den Bohrer D in Schlag-/Drehbewegung
versetzen und den Stab bis zum Ende des
Bohrloches C einführen.
- Den Bohrer D abnehmen.
- Die Schraube mit einem Sechskantschlüssel H in
der Gewindebuchse F lösen.
- Die Gewindebuchse F vom Stab A schnell
abdrehen und entfernen.
Den Stab nicht aus seiner im Bohrloch
eingenommenen Stellung ziehen.
Raumtemperatur
-5° ÷
0° C
0° ÷ 10° C
10° ÷ 20° C
> 20° C
Härtungszeit
30 Stunden
60 Minuten
20 Minuten
10 Minuten
2-19