Download Print this page

Advertisement

To operate the product
CAUTION: Do not use the product to move
the concrete to the side.
1. Fill concrete in equally thick layers, 30–50 cm / 12–
19 in. (B).
2. Put the vibrator head approximately 15 cm / 6 in. (A)
down into the nearest lower layer of concrete. This
causes the layers of concrete to mix correctly.
C
Introduction
WARNING: Read and understand the safety
chapter before you do maintenance on the
product.
To clean the product
CAUTION: Do not use a high-pressure
washer to clean the product.
Use running water from a hose to clean the product.
Remove concrete from the surfaces of the product
after each operation before the concrete becomes
hard.
Remove grease and oil from the handle.
To remove the vibrator head
1. Put the vibrator head in a tube vise and tighten the
tube vise fully.
2. Remove the clamp from the hose. Discard the
clamp.
3. Pull the hose to disconnect it from the hose nipple.
4. Move the rubber hose protection from the terminals.
1006 - 002 - 27.03.2020
3. Wait approximately 10–20 seconds until the surface
around the vibrator head is shiny and no air bubbles
come to the surface.
4. Remove the vibrator head slowly to let the concrete
fill the hole from the vibrator head.
5. Put the vibrator head down into the concrete at a
distance of 30–50 cm / 12–19 in. (C) from where you
put it before.
B
6. Do step 4 and 5 again and again. Continue until the
air bubbles are fully removed from the area of
concrete.
A

Maintenance

5. Cut and discard the thermal insulation and
disconnect the terminals.
To disassemble and assemble the
vibrator head (AX 36, AX 40, AX 48,
AX 56, AX 65)
1. Remove the end cap (A) from the stator tube (B).
A
Note: The end cap (A) has a right hand thread.
2. Remove the nut (C), the wire cover (D) and the
rubber gasket (E).
F
E
D
B
C
7

Advertisement

loading