Cutting Deck Motor Service - Toro Groundsmaster 4500-D Series Service Manual

Hide thumbs Also See for Groundsmaster 4500-D Series:
Table of Contents

Advertisement

Cutting Deck Motor Service

g308863
1.
Dust seal (2 used)
2.
Retaining ring
3.
Flange washer
4.
Shaft seal
5.
Front flange
6.
Pressure seal
7.
Backup gasket
Disassembly
(Figure
Groundsmaster
®
4500-D/4700-D
19245SL Rev A
8.
Front wear plate
9.
Drive gear
10.
Dowel pin (4 used)
11.
Idler gear
12.
O-ring
13.
Body
14.
Rear wear plate
g308864
119)
1. Plug motor ports and clean the outside of the motor thoroughly. After
cleaning, remove plugs and drain any oil out of the motor.
2. Use a marker to make a diagonal line across the front flange, body and rear
cover for assembly purposes
Figure 119
15.
16.
17.
18.
19.
Figure 120
(Figure
120).
Page 5–125
Rear cover
Anti-cavitation valve
Relief valve
Cap screw (4 used)
Washer (4 used)
Hydraulic System: Service and Repairs

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Groundsmaster 4700-d series

Table of Contents