Changing The Transport Rollers - Leister SEAMTEK W-AT Series Manual

Table of Contents

Advertisement

7.10.1 Changing the Transport Rollers

Caution: Allow all components to cool down before changing the transport rollers in order to prevent
burns.
Changing the transport rollers
In the "Periphery" area, set the wedge and the clamp force to "Manual" and "Off".
Risk of crushing
4C
Danger: Do not reach between moving components, e.g., the transport
rollers (4). When working on the open system, do not wear articles of
clothing such as scarves, shawls, or neckties and tie up long hair or protect
it by wearing headgear.
The transport rollers (4) are now open and can be
changed.
Completely detach the M6 screws and remove these to-
gether with the spring ring and washer (4C). The trans-
4
port rollers (4) can now be easily removed.
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Seamtek w-900 atSeamtek w-2000 at

Table of Contents