11. Lubricate the two plated inside tubes with an aerosol dry lubricant, such as Sprayon™ #S00708 T.F.E. DRY LUBE. See detail on
Page 17. Sprayon™ #S00708 T.F.E. DRY LUBE is available from Porter Athletic Equipment Company, in a 10 oz. aerosol can
(Porter part number MISC00243000). Run height adjuster up and down (10' to 8') several times. NOTE – protect the floor with a
drop cloth to prevent a slippery build-up on the gymnasium floor.
CHECK HEIGHT ADJUSTMENT OPERATION
Proceed to Page 12 for wiring requirements and testing of height adjuster with Key Switch operation.
Proceed to Page 13 for hook-up and testing of height adjuster with Powr-Stick operation.
Proceed to Page 14 for wiring requirements and testing of height adjuster with Sportsonic II operation.
®
Proceed to Page 15 for wiring requirements and testing of height adjuster with Powr-Touch
operation.
11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CENTER-STRUT and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents