Cooling water
NOTICE
After initial commissioning, run the device for at
least 2 minutes to allow for the cooling water to
circulate and check the water level again.
Compressed air
16
®
CC plus ⋅ Nautilus
®
T
WARNING
The warning signs provided (symbol:
"pacemaker") are to be placed at the
entrances to the room in which the
ready-to-use device is located!
Adding cooling water (see page 72).
1/4 "
5 .... 8 bar (0.5 .... 0.8 MPa) (72.5 .... 116 psi)
≥ 100 l / min
Insufficient supply of compressed air during
pressure casting (warning message W011) can be
compensated with the compressed air reservoir
(REF 16260).
Insufficient supply of compressed air during evacu-
ation (warning message W002, W013) cannot be
compensated with the compressed air reservoir.
Important! Remove protective cap!

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Nautilus CC plus and is the answer not in the manual?

Questions and answers

Katrina
February 18, 2025

Once the preheat is complete, and mold is inserted into the casting chamber, how low can the temperature drop before climbing up to casting temperature

1 comments:
Mr. Anderson
February 18, 2025

The minimum temperature drop allowed in the BEGO NAUTILUS CC Plus casting chamber before it needs to rise to the casting temperature is 10°C (50°F). If the cooling water temperature drops below this, condensation may form and pose a hazard.