Preparation; Assembling - Toyota Expert EPS9000 Instruction Manual

Computerized embroidery system
Table of Contents

Advertisement

PREPARATION

ASSEMBLING

● Attaching the thread guide
1.
Stand the thread stand shafts (1) (2 pcs. in
total) on the thread stand plate (2) perpendicu-
lar to it by screwing in the shaft at positions A
and B on the plate (2). Securely tighten the
thread stand shafts (1) by the spanner set on
the flats at the middle of the thread stand shaft
(1) to fix them on the thread stand plate (2).
2.
Place the thread guide (4) on top ends of two
thread stand shafts (1), and align the two holes
at the center of the thread guide (4) with the
thread stand shafts (1). Insert then hexagon
socket head cap screws (5) in the holes and
securely tighten the screws to lock the guide
and the shafts.
● Mounting the spiral tubes
1.
Place the joint on the one end of spiral tube
(large) in the U-shaped slot on the thread guide
and fix it in the slot by pressing in the arrow
direction. Set and fix the joint on the other end
of spiral tube in the U-shaped slot on the ten-
sion base in the same way. Repeat the same
steps on the U-shaped slots as numbered (1) to
(3) and (13) to (15) in the figure shown at right.
Spiral tube (large):
2.
In the similar manner, fit the spiral tube B
(medium) into the U-shaped slots.
Spiral tube (medium):
3.
In the similar manner, fit the spiral tube
(small) into the U-shaped slots.
Spiral tube (small):
Thread guide (4)
Thread stand shaft (1)
Thread stand
plate (2)
Tube joint
No. 1 to No. 3/
No. 13 to No. 15
No. 4, No. 5,
No. 11 and No. 12
(1)
No. 6 to No. 10
14
A
B
(1)
(2)
(3)
(4)
(5)
(12)
Spiral tube (large)
Tube joint
U-shaped slots
(2)
(3)
(4)
(5)
(12)
(13)
(14)
Tension base
Hexagon socket head
cap screw (2 pcs.) (5)
Flats
U-shaped slots
(13)
(14)
(15)
Thread guide
(15)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents