3 - Maintenance

Safety standards The following are the warnings to be respected during the maintenance operations
Skilled personnel The maintenance operations must be carried out by Skilled Personnel:
Circuit-breaker life The circuit-breakers SACE Emax 2, with or without opening or closing coils, can withstand the following
58 | © 2019 ABB | 1SDH001000R0002 - ECN000109166 - Rev. D
HAZARD! RISK OF ELECTRIC SHOCK! Risk of electric shock or accident.
WARNING! before proceeding with any maintenance operation, it is mandatory to:
• Set the circuit-breaker to the open position and make sure that the springs of the
operating mechanism are discharged.
• In the case of a withdrawable circuit-breaker, extract the circuit-breaker from the fixed
part (see the indication DISCONNECTED)
• If work must be performed on fixed circuit-breakers or on fixed parts, disconnect
the power supply to the power circuit and auxiliary circuits and visibly ground the
terminals on both the supply side and load side.
• Use adequate personal protection equipment, ensure that the apparatus is in a safe
condition and proceed in accordance with the Laws in force.
electrically skilled person (IEV 195-04-01): person with relevant education and experience to enable him or
her to perceive risks and to avoid hazards which electricity can create.
ABB declines all liability for damage to persons or property caused by failure to comply with the instructions
in this document.
operating cycles if regularly serviced. For further information see chapter 4 - Environmental conditions on
page 23.
Interrup-
Mechanical life with
ted rated
regular maintenance
current
circuit-
breaker
No. of
IEC 60947
Iu (40°C) [A]
operations
(x 1000)
< 1250
25
1600
25
E2.2
2000
25
2500
20
< 2500
20
2500
20
E4.2
3200
20
4000
15
4000
12
E6.2
5000
12
6300
12
(1)
Only for 900V and 1150V circuit-breakers Operating sequences/hour = 10.
Electrical life
440V
690V
AC
AC
Frequency
of
No. of operations (x 1000)
operations/
hour
60
15
15
60
12
10
60
10
8
60
8
7
60
10
10
60
8
8
60
7
7
60
5
4
60
4
4
60
3
2
60
2
2
Putting into service and maintenance | 3 - Maintenance
ABB | SACE Emax 2
900V
1150V
AC
AC
Frequency of
operations/
hour
2
1
30
2
1
30
2
1
30
2
1
30
0,5
1
20
(1)
0,5
1
20
(1)
0,5
1
20
(1)
0,5
1
20
(1)
1
1
10
1
1
10
1
1
10
Continued on the next page