ABB SACE Emax E2.2 Installation, Operation And Maintenance Instructions For The Installer And The User page 37

Low voltage air circuit-breakers
Table of Contents

Advertisement

iTest pushbutton The iTest pushbutton is useful for three operations:
Test connector The test connector allows the connection of Ekip TT, Ekip T&P and Ekip Bluetooth modules, in order to
35 | © 2019 ABB | 1SDH001000R0002 - ECN000109166 - Rev. D
• Perform tests (circuit-breaker opening test and LED test). Consult chapter 6 - Test on page 44.
• Reset the signal of the tripped protection. This operation can be performed when the circuit-breaker is
both open and closed and with currents present, by pressing the push-button for about 1 second (the
signal disappears when the push-button is released).
• With the trip unit off, check the information relating to the switch-off or tripping event.
NOTE: with the trip unit off, pressing of the iTest button switches on (for approximately 4
seconds):
• the power-on LED, if the trip unit is off due to an energy drop (primary current less than the
minimum level of operation, removal of auxiliary power supply with circuit-breaker open, etc...).
• the protection tripped LED if the trip unit is off due to a protection trip.
perform the following operations:
• Temporary energizing of the trip unit to check the status, and perform the trip test (option possible with
all the front interface modules).
• Analysis, supervision and setting of additional parameters through external communication test units (Ekip
T&P, Ekip Bluetooth).