NOTE
Additional SolarEdge inverters (without batteries) can be connected over
RS485. The inverters will participate in export limitation and Smart Energy
Management.
PV modules connected to power optimizers are not mandatory for charge/
discharge profile programming.
Additional References
This document describes basic system connection and configuration - PV system
(power optimizer strings), one inverter, one battery, and one meter.
For additional configuration options refer to the StorEdge Solution Applications -
Connection and Configuration Guide, available at:
https://www.solaredge.com/sites/default/files/storedge_applications_
connection_and_configuration_guide.pdf
Installation Equipment List
Standard tools can be used during the installation of the SolarEdge
system. The following is a recommendation of the equipment needed for installation:
Allen screwdriver for 5mm screw type for the inverter enclosure screws.
Allen screwdriver for M5/M6/M8 screw types
Standard flat-head screwdrivers set
Non-contact voltage detector
Cordless drill (with a torque clutch) or screwdriver and bits suitable for the surface
on which the inverter and optimizers will be installed. Use of an impact driver is not
allowed.
Appropriate mounting hardware (for example: stainless bolts, nuts, and washers)
for attaching:
the mounting brackets to the mounting surface
the power optimizer to the racking (not required for smart modules)
MC4 crimper
Wire cutters
Wire strippers
StorEdge Single Phase Inverter with HD-Wave Technology MAN-01-00627-1.1
Chapter 1: Overview
11