Operation; Safety Instructions For Operation - Siemens SINAMICS SM150 6SL3810-7NN38-0AA1 Operating And Installation Instructions

Medium-voltage drive
Table of Contents

Advertisement

Operation

8.1

Safety instructions for operation

When carrying out any work, carefully observe the information provided in Chapter "Safety
instructions (Page 15)".
Electric shock caused by a high voltages
High voltages are present both during operation and also after the device has been switched
off. When touched, these voltages can lead to death or severe injury.
● Ensure that no voltage is present when the doors of the power unit are open.
● Always keep the doors closed in operation.
Danger if operated in spite of faults
Operation with an active fault can result in death, severe injury and significant material damage.
● Observe the fault and alarm messages.
● Eliminate the source of the fault. Only then commission the device. You can find further
● If it is not possible to correct a fault, inform the manufacturer's service personnel
Danger when operating with ground fault
The type and location of the fault cannot be established just from a ground fault error message.
For example, the glow discharge at the winding overhang of the machine may result in a fault
signal. In the event of continued operation, serious follow-on faults up to electric arcs are
possible. This can result in death, serious injury or material damage.
● Immediately switch off the device if a ground fault occurs during operation. Then identify and
● The company operating the plant or system is responsible for the consequences when the
Danger when the permissible short-circuit currents are exceeded
Serious follow-on faults are possible, if the specified short-circuit current values are exceeded.
This can result in death, serious injury or material damage.
● Observe the maximum permitted short-circuit currents and maximum specified short-circuit
SINAMICS SM150 6SL3810-7NN38-0AA1
Operating Instructions Rev.201910281406 EXAMPLE
information on alarms and faults in the section "Indicating and rectifying faults."
immediately. For additional information, see Chapter "Service & support".
eliminate the source of the ground fault.
device is still operated after a ground fault has been identified. Carry out a risk analysis.
times.
8
107

Advertisement

Table of Contents
loading

Table of Contents