Commissioning With The Simatic Manager (Profinet) - Weidmuller UR20-4COM-IO-LINK Manual

Remote-i/o-system u-remote communication module
Table of Contents

Advertisement

6.4
Commissioning with the SIMATIC Manager
(PROFINET)
Installing the device description files
Projects must not be open in the hardware
configuration tool while the files are being
installed!
▶ Close any open projects before installing the
device description files!
▶ In the hardware configuration tool, open Installing
Extras / GSD files
▶ Select the directory in which you have stored the device
description files.
The available files are displayed.
Selecting the GSD(-ML) file
▶ Select the files that you would like to install.
▶ Click Install.
▶ When the installation is complete, click Close.
▶ Update the device catalogue via Extras / Update cata-
logue.
The devices associated with the current device description
file are now listed in the device catalogue.
2547720000/03/09.2019
6 Commissioning | Commissioning with the SIMATIC Manager (PROFINET)
Integrating IO-Link master with SIMATIC Manager
▶ Start SIMATIC Manager.
▶ Create a new project or open an existing project.
▶ Configure the controller and the network as usual.
▶ Add the appropriate u-remote fieldbus coupler to the sub-
net.
▶ In the hardware configuration tool, click the icon for the
fieldbus coupler.
The module list is displayed in the lower part of the window.
▶ In the module list, click the slot to which you want to add
the IO-Link master.
The device description files support various configura-
tions for the UR20-4COM-IO-LINK module. The configu-
rations differ only in the length of the process data for the
IO-Link devices connected, e.g. 16 bytes input data and
16 bytes output data for IO-Link devices for the configuration
UR20-4COM-IOL-16BYTE-INOUT.
Select module with the appropriate process data length
▶ Determine the required process data length of the
IO-Link master, by adding the length of the input data and
output data of the IO-Link devices connected.
▶ In the device catalogue, select the UR20-4COM-IO-LINK
module with a process data length greater than or equal
to the required length.
▶ Double-click the module, or drag it into the module list.
The module is displayed in the module list.
Manual Communication module UR20-4COM-IO-LINK
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ur20 seriesUr20-4com-io-link

Table of Contents