Mounting The R&S Smb100B In A Rack - R&S SMB100B Getting Started

Rf signal generator
Table of Contents

Advertisement

®
R&S
SMB100B
3. WARNING! A stack of instruments can fall over and cause injury. Never stack
more than three instruments on top of each other. Instead, mount them in a
rack.
Stack as follows:
● It is best if all instruments have the same dimensions (width and length).
● The overall load on the lowest instrument must not exceed 500 N.
● With smaller instruments on top of the lowest instrument, the overall load
on the lowest instrument must not exceed 250 N.
max. 500 N
Correct
4. NOTICE! Overheating can damage the R&S SMB100B.
Prevent overheating as follows:
● Keep a minimum distance of 10 cm between the fan openings of the
R&S SMB100B and any object in the vicinity.
● Do not place the R&S SMB100B next to heat-generating equipment such
as radiators or other instruments.
4.4.2
Mounting the R&S SMB100B in a Rack
To prepare the rack
1. Observe the requirements and instructions in
on page 9.
2. NOTICE! Insufficient airflow can cause overheating and damage the
R&S SMB100B.
Design and implement an efficient ventilation concept for the rack.
Getting Started 1422.1045.02 ─ 03
max. 250 N
Different dimensions
Setting Up the R&S SMB100B
Too many instruments
"Setting up the instrument"
Preparing for Use
17