Entering Identity Information; Network Configuration - Paradyne Hotwire 8775 Installation Instructions Manual

M/sdsl termination unit
Hide thumbs Also See for Hotwire 8775:
Table of Contents

Advertisement

Entering Identity Information

Network Configuration

8775-A2-GZ40-10
After accessing your unit for the first time, use the Change Identity screen to
determine SNMP administrative system information that will be displayed on the
Identity screen of the Status branch. To access the Card Identity screen, follow
this menu selection sequence:
Main Menu
Control
The following illustration shows an E1 network application using an 8775 M/SDSL
Termination Unit for access concentration in a central office (CO). A frame relay
switch and a router are connected, through the termination unit, to partner units
supporting an E1 host or router, and frame relay encapsulated or unframed data.
Frame
Relay
Switch
V.35
Router
V.35
8775 Termination Unit
in 8600 DSLAM
A DSLAM-to-DSLAM configuration requires that the 8775 at one end of the link
be set to NTU mode. 8775 Termination Units default to LTU mode.
March 1999
Change Identity
E1 Network
CO Site
V.35
2.048 Mb
SDSL
V.35
E1 Host
(Frame Relay
7975
Encapsulated
Data)
V.35
Router
over
(Frame Relay
7975
Encapsulated
Data)
V.35
Router
7975
Customer
Premises (CP)
98-15857-01
13

Advertisement

Table of Contents
loading

Table of Contents