Fitting the thermal insulation
Boiler body thermal insulation
Parts required from thermal insulation pack 1
/
Thermal insulation jacket
qW
qE
Thermal insulation mat, bottom back
qT
1.
Fig. 11
Black side outwards
A
Note on step 1.
Remove thermal insulation jacket from the upper boiler
cover and connect with an overlap.
Boilers up to 1120 kW are supplied with 2 thermal
insulation jacket parts; boilers from 1350 kW with 3
thermal insulation jacket parts.
Mounting the fixing rails
Parts required from thermal insulation pack 2
Side panel
3
/
Fixing rails
7
8
14
4.
A
Parts required from thermal insulation pack 2
Thermal insulation mat, top back
qR
Spring hooks from bag of fixing parts
wT
3.
2.
Centre rails
9
Wing screws from bag of fixing parts
wT