Attaching The Top And Bottom Rails - Viessmann Vitocrossal Installation Instructions For Contractors

Table of Contents

Advertisement

Attaching the top and bottom rails

B
4.
C
D
Fig. 13
Rail, top (long)
A
Rail, top (short)
B
Note
Use M 6 screws.
2. Loosely screw 2 screws into each boiler base rail.
1.
A
3.
2.
Rail, bottom (long)
C
Rail, bottom (short)
D
4. Attach the rail to the screws of the boiler base rail.
Tighten the screws.
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cru

Table of Contents