Bomag BPR 35/42 D Operating Instructions, Maintenance Instructions page 53

Table of Contents

Advertisement

Fig. 67
Check whether the hydraulic oil level is ap-
l
prox. 40 mm below the filler opening (Fig. 67),
top up if necessary.
For quality of oil refer to the table of fuels and
lubricants.
Filling up hydraulic oil
Fig. 68
i
Note
Lay a cloth down before slackening the venting
screw.
Shift the travel lever forward against the stop.
l
BPR 35/40 D BPR 35/60 D
Fig. 69
Slacken the bleeding screw.
l
Wait until all air has escaped (Fig. 69).
l
Tighten the bleeding screw.
l
Fig. 70
Fill in hydraulic oil to approx. 40 mm below the
l
edge of the filler opening (Fig. 70).
i
Note
After bleeding check the hydraulic oil level, top up
if necessary.
B O M A G
M a i n t e n a n c e e v e r y y e a r
5 3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bpr 35/60 d

Table of Contents