Crosswater GLIDE II GL3516F Installation Instructions

Crosswater GLIDE II GL3516F Installation Instructions

Two door tower unit

Advertisement

Quick Links

BATHROOM FURNITURE RANGE
Tools & equipment needed: Drill, 8mm Suitable drill bit, Phillips screwdriver, Spirit level, Ruler/tape measure, Pencil,
Silicone sealant (clear).

IMPORTANT - Advice and safety - Please read before installation

Please read these instructions carefully before starting
installation and keep in a safe place for future reference.
Check the contents of the pack carefully before installation.
Crosswater will not be held responsible for any de-fit/ re-fit
costs where faulty product has been fitted.
If any fault is found with materials or workmanship, it must be
reported immediately to the manufacturer. Remedial action
will be taken, based on information received, on condition
that: 1. Full details are supplied to the manufacturer; 2. The
product has not been modified or tampered with; 3. The ma-
nufacturer is informe damage/shortages prior to installation.
We do not accept responsibility for any problems that may
occur through incorrect installation.
Advice & Safety
This product should be only be installed by a suitably quali-
fied Plumber/installer. Should the installation be completed
by a non-qualified person any product guarantee maybe con-
sidered invalid. For a claim made under our warranty written
certification of your installers qualifications can be required.
It is advised that all doors and drawers are removed prior to
fitting to avoid unnecessary damage occurring.
Ensure the room is well heated and ventilated.
It is recommended that walls are fully tiled before furniture
and accessory installation. This ensures that the product is
installed flat to the tile face and allows product to be easily
removed if required in the future.
INSTALLATION INSTRUCTIONS
Two Door Tower Unit
GL3516F
x2
These instructions have been prepared for your guidance,
you must exercise due care at all times.
Please note that some units are heavy. Always take care
when lifting, and follow health and safety guidelines. It is re-
commended that 2 people carry out the installation of larger
basin/vanity units.
Handle glass with care. Although the glass supplied is tou-
ghened safety glass (to BS6206), impacts can damage both
the glass and the furniture.
Warning! Please check for any hidden pipes or electrical ca-
bles before drilling holes in the floor or walls.
When using power tools always follow the manufacturer's
user instructions.
Care & Cleaning
NEVER use products containing bleach, cleaners of a gritty
or abrasive nature or so called "glass and mirror" cleaning
products. Use a well wrung chamois leather or micro fibre
cloth for furniture carcasses.
Resin wash basins should only be cleaned with a mild deter-
gent or warm soapy water; in hard water areas a good quality
lime-scale remover can be applied.
Clean mirrors only with a micro fibre cloth.
If any maintenance is required then it must be carried out by
a qualified Plumber.
x4
GLIDE II
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GLIDE II GL3516F and is the answer not in the manual?

Questions and answers

Summary of Contents for Crosswater GLIDE II GL3516F

  • Page 1 Check the contents of the pack carefully before installation. Please note that some units are heavy. Always take care Crosswater will not be held responsible for any de-fit/ re-fit when lifting, and follow health and safety guidelines. It is re- costs where faulty product has been fitted.
  • Page 2 Tower Unit Installation Step 1 Step 2 Plan unit position We suggest positioning the tower unit so it is level with any other unit that has been installed. Remove the TOP door before installation. a: Lift the tab (shown) on both hinges, to release. b: Pull door back. Step 3 a: Use the measurements opposite, to position the ‘wall brackets.
  • Page 3 Door 1: changing door opening side a: Lift tab (shown) on both hinges, to release. g: Rotate the top door ‘1’ as shown. b: Pull door back. c: Lift the hinge plate tabs. d: Remove h: Reposition both hinges onto the hinge plates. the hinge plates.
  • Page 4 Before installing wooden bathroom products into a new property, extension or recently plastered room we strongly For any further information please contact advise the building/room is completely dry, well ventilated Crosswater on: 0345 873 8840 and adequately heated. Or visit our web-site at: www.crosswater.co.uk The manufacturer reserves the right to make technical modifications without prior notice.

Table of Contents