5.1.3
Step 1: Configuring the PC stations using the Commissioning
Wizard
The Commissioning Wizard (CW) automatically appears on the SIMATIC PCS 7
BOX station following the installation of SIMATIC PCS 7 V6.0 SP3 and booting of
the SIMATIC PCS 7 BOX station. This is where you select the modules to use for
your PCS 7 project.
With the configuration variant "SIMATIC PCS 7 BOX with external engineering",
the external ES and the SIMATIC PCS 7 BOX station must be viewed separately
during commissioning and configuration.
Note
Use the CP 5611 module for production operation either on the external ES or on
the SIMATIC PCS 7 BOX station depending on the connection of the PDM.
The authorization for the PDM software must be ordered separately to activate the
PDM on the respective station.
CW on the SIMATIC PCS 7 BOX Station
Requirements
Installation of PCS 7 V6.0 SP3
Software WinAC 3.4 for SIMATIC S7 CPU 416-2 PCI
Follow These Steps:
1. If the PDM is connected to the SIMATIC PCS 7 BOX station, use the on-board
CP 5611 module for your PCS 7 project by activating the option "Use module
in configured PC station for production".
2. Specify the slot in the "Index" field.
3. Use the on-board Ethernet network card for your PCS 7 project by activating
the option "Use module in configured PC station for production" and specifying
the slot in the "Index" field.
Note
All other settings in the CW are the same as the "single station system"
configuration variant.