TA Instruments ARES-G2 Getting Started Manual page 41

Rheometer
Table of Contents

Advertisement

3
Connect the outlet line from the regulator to the test station at the "Air Inlet" port (see the figure on the
next page for its location). This is an input line to the test station that is used to supply air to the oven,
motor, transducer air bearings, and throughout the test station.
4
Set the Purge Rate Adjuster knob to the setting number 2.
Figure 20 Purge rate adjuster knob.
5
Turn on the air supply and use the pressure regulator knob to set the supply pressure to 80 to 90 psi (0.55
to 0.6 MPa).
Figure 21 Pressure regulator.
CAUTION: Read the installation, operating, and maintenance instructions that were supplied with
your air dryer. Failure to properly operate and maintain your air dryer will result in extensive dam-
age to this instrument. Excessive moisture in the air supply may damage the test station.
MISE EN GARDE: Lisez les instructions d'installation, d'utilisation et de maintenance fournies avec
votre déshydrateur d'air. L'utilisation et la maintenance inappropriées du déshydrateur d'air entraî-
nent d'immenses dégâts sur l'instrument. L'excès de moisissure dans l'alimentation en air peut
endommager la station d'essai.
ARES-G2 Getting Started Guide
Page 41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents