Appendix A: Errors And Troubleshooting; Identifying Errors - SolarEdge SE12.5K Installation Manual

Three phase inverter with synergy technology
Hide thumbs Also See for SE12.5K:
Table of Contents

Advertisement

76

Appendix A: Errors and Troubleshooting

Appendix A: Errors and Troubleshooting
This appendix describes general system problems, and how to troubleshoot them.
For further assistance, contact SolarEdge Support.

Identifying Errors

Errors may be indicated in various system interfaces: On the inverter bottom panel, a
red LED indicates an error. In the monitoring platform and the SetApp, errors are
displayed with codes.
For more information on the codes displayed for error and warning
messages, refer to
installation-guide-error-codes.pdf
appear in SetApp, monitoring platform, and LCD (for inverters with
LCD).
To identify the error types, use the methods described below.
To identify the error type using the inverter LEDs:
1. Move the ON/OFF/P switch to P position for less than 5 seconds and release it.
2. Observe the LED lights and use the following table to identity the
error type. For more information, refer to
https://www.solaredge.com/leds
Arc detected
Isolation or RCD problem
Grid error
High temperature
Pairing failed
Other issue
To identify the error type using the monitoring platform:
1. Open the site dashboard and click the Layout icon.
2. Right-click the inverter and select Info from the menu ( Figure 41 ). The inverter
details window is displayed ( Figure 42 ).
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2
http://www.solaredge.com/sites/default/files/se-inverter-
. This document describes errors that
.
Error type
LED color and state
Red
Green
ON
OFF
Blinking
OFF
OFF
ON
OFF
Blinking
OFF
OFF
OFF
OFF
Blue
OFF
OFF
OFF
OFF
ON
Blinking

Advertisement

Table of Contents
loading

Table of Contents