Chapter 3: Installing the Primary and Secondary
Unit(s)
Install the units either before or after the modules and power optimizers have been
installed.
First install the Primary Unit, then the Secondary Unit(s) (in any order).
CAUTION!
Do not rest the connectors at the bottom of the units on the ground, as it
may damage them. To rest a unit on the ground, lay it on its back.

Primary Unit Package Contents

Primary Unit (comprised of an inverter and Connection Unit) and pre-
assembled cables that connect to the Secondary Unit(s)
Mounting bracket kit
Two Allen screws for fastening the unit to the mounting bracket
Level, for marking the mounting brackets' positions
Cable lock(s)
For built-in wireless communication: antenna and mounting bracket
Installation guide

Secondary Unit Package Contents

Secondary Unit
Mounting bracket kit
Two Allen screws for fastening the unit to the mounting bracket

Identifying the Units

The stickers on the Primary Unit and on the Connection Unit specify the inverter's
Serial Number and Electrical Ratings.
When opening a site in the SolarEdge monitoring platform and when contacting
SolarEdge support, provide the inverter's serial number.
Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2

Chapter 3: Installing the Primary and Secondary Unit(s)