Version History - SolarEdge SE12.5K Installation Manual

Three phase inverter with synergy technology
Hide thumbs Also See for SE12.5K:
Table of Contents

Advertisement

6

Version History

Version History
Version 1.2 (February 2019)
Updated technical specifications
Added appendix 'Determining the Circuit Breaker Size' and paragraph
referencing to it, in the 'Grid Connection Guidelines' section.
Added step 'Disconnect the AC to the inverter by turning OFF the
circuit breakers on the distribution panel' in Replacing a Secondary
Unit
In the 'To connect AC and ground' procedure - added note about lug
requirements.
Version 1.1 (May 2018)
Modified the LED table: deleted 'no AC power' row ,in Inverter
firmware upgrade row: changed blinking to alternating, added a
comment and footnote and separated the Percentage of AC
Production table form the main table
Changed clearance between inverters to 5 cm.
Grid Connection Guidelines - 'In some countries, the SolarEdge
three phase inverters can be connected to 220 /230 V-L delta
grids. Added 220 /230 V-L
Mounting and Connecting the Primary and Secondary Unit(s)
added step 10 cable ring
Addition of possibility to use compatible connectors from third-party
manufacturers upon SolarEdge limitation
Changed inverter name to Three Phase Inverter with synergy
technology
Version 1 (December 2017)
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2
Removed the 'Recommended circuit breaker/ fuse size to use
at the grid connection point' table and other modifications

Advertisement

Table of Contents
loading

Table of Contents