Chapter 6: Setting Up Communication

The inverter sends the following information to the monitoring platform:
Power optimizer information received via the DC power lines (the PV output
circuit).
Inverter information
Information of any other connected devices.
This chapter describes setting up communication between:
The inverter and the monitoring platform through the Internet (wired/
wireless), or through a cellular connection.
Multiple inverters for a master/slave configuration.
Communication setup is not required for power harvesting, however it is needed for
using the monitoring platform.
NOTE
It is recommended to connect communication connections before
connecting the AC, for easier access to the communication board.
CAUTION!
When connecting the communication cables, make sure that the ON/OFF/P
switch on the Connection Unit is turned OFF, and the AC is turned OFF.
When configuring the communication parameters, make sure that the
ON/OFF/P switch on the Connection Unit is OFF, and the AC is turned ON.
Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2
Chapter 6: Setting Up Communication
61