Primary Unit Interface - SolarEdge SE12.5K Installation Manual

Three phase inverter with synergy technology
Hide thumbs Also See for SE12.5K:
Table of Contents

Advertisement

22

Primary Unit Interface

Primary Unit Interface
Figure 6: Primary Unit bottom and side interfaces
Mounting hole: for securing the unit to the bracket and for connecting an
optional secondary grounding cable.
Grounding screw: for connecting an optional secondary grounding cable.
AC and DC conduit entries: Connection points of the Connection Unit.
Two communication glands: For connection of communication options. Each
gland has three openings. Refer to Setting Up Communication on page 61
for more information.
ON/OFF/P Switch:
Figure 7: ON/OFF/P switch
-Three Phase Inverter with Synergy Technology Installation MAN-01-00402-1.2

Advertisement

Table of Contents
loading

Table of Contents